| All Current Incidents |
| Accident\Incident - Interstate 35W |
Interstate 35W southbound: between Exit 4A Cliff Road and Exit 4B Black Dog Road crash last updated today at 6:46 PM CDT |
| |
| Accident\Incident - Interstate 394 |
Interstate 394 eastbound: between Exit 7 Penn Avenue and Exit 8A Dunwoody Boulevard crash last updated yesterday at 8:16 AM CDT |
| |
| Accident\Incident - MN 77 |
MN 77 southbound: between MN 13 and East Old Shakopee Road vehicle spun out last updated today at 6:46 PM CDT |
| |
| Roadwork - Interstate 35E |
Interstate 35E in both directions: from Exit 107C University Avenue to Exit 109 Maryland Avenue bridge construction — until December 31, 2015 Comment: The Cayuga Project includes multiple construction sites. For more information and to sign up for email alerts CLICK HERE last updated April 12 |
| |
| Roadwork - Interstate 35W |
Interstate 35W southbound: between I-94 and Exit 16A bridge construction, bridge closed -- follow the detour signs — until August 16 Comment: For more information CLICK HERE No OSOW Restrictions last updated May 3 |
| |
| Roadwork - Interstate 94 |
Interstate 94: at Wisconsin State Line road construction — Comment: For WisDOT West Central Freeway Construction Updates: Click Here last updated April 17 |
| |
| Roadwork - Interstate 494 |
Interstate 494: from Exit 1B 34th Avenue South to MN 100 major road construction — until September 30 Comment: Improvements to I-494 and replacement of the Xerxes Ave Bridge are underway. For more info and to sign up for email project updates CLICK HERE last updated March 18 |
| |
| Roadwork - Interstate 694 |
Interstate 694 in both directions: from I-35W to Exit 104C Victoria Street long term road construction Width limit 10 ' 0 " — until November 15 Comment: Will be ramp closures and non-peak lane closures. For more info CLICK HERE last updated April 12 |
| |
| Roadwork - US 52 |
US 52 in both directions: at I-94, MN 803A bridge construction — until September 15, 2014 Comment: The Lafayette Bridge is being replaced. For more information Click Here NOTE: No vehicle or vehicle combinations over 35 ft. in length are allowed to use the Lafayette Bridge north of Plato Blvd until the crossover is removed . last updated May 9 |
| |
| Roadwork - US 61 |
US 61 in both directions: from after MN 55 to before US 10 bridge construction — until December 30 Comment: A new Hastings Bridge is being built across the Mississippi River. For more info and to sign up for weekly e-mail project updates CLICK HERE last updated November 30 |
| |
| Roadwork - MN 13 |
MN 13 in both directions: from Washburn Avenue to Nicollet Avenue major road construction — until October 1 Comment: This is a Dakota County led project. For detailed information and to sign up for email updates: Click Here last updated April 25 |
| |
| Roadwork - MN 100 |
MN 100 in both directions: between Exit 14B 57th Avenue North and I-94 bridge construction, bridge closed — until August 16 Comment: Bridge closed. For more detailed information Click Here last updated April 29 |
| |
| Alert - Interstate 35E |
Interstate 35E southbound: from Exit 88A to Exit 88B Dakota County Road 42 road closed, bridge construction -- follow the detour signs — until June 2 Comment: For project and detour information and to sign up for email updates: Click Here last updated May 9 |
| |
| Alert - Interstate 94 |
Interstate 94 in both directions: from MN 120 to I-494, I-694 roadway reduced to two lanes, bridge maintenance operations — until May 23 Comment: Crews will be installing structures for an overhead bridge to support a new electronic traffic sign for westbound traffic. last updated May 14 |
| |
| Alert - MN 100 |
MN 100 in both directions: at Exit 14B 57th Avenue North road closed to traffic due to bridge construction work -- consider using an alternate route — until Monday, at about 5:00 AM CDT Comment: MN 100 closed at 57th Avenue North . Motorists will be detoured to the Highway 100/57th ramps. last updated May 14 |
| |
| Alert - MN 101 |
MN 101 in both directions: from after Hennepin County Road 14 to before MN 901B road closed, road reconstruction — until November 15 Comment: No OSOW restrictions. This is a City of Chanhassen led project. For more information and to sign up for email project updates: Click Here last updated April 25 |