Home | Getting Around | 511 Traveler Info |
Mn/DOT A to Z | Contact | Search |
Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  
 All Current Incidents   Text Only
 
Accident
Alert
Closure
Roadwork
Difficult Driving
Fair Driving

Northwestern North Central Northeastern
West Central East Central
Southwestern South Central Southeastern
 
All Current Incidents
Roadwork - Interstate 94
Interstate 94 in both directions: from US 71 to MN 238
road construction, single line traffic - alternating directions, work in the median, width limit in effect Width limit 14 ' 0 " daily — until tomorrow at about 10:30 AM CDT
Comment: For more information:Click Here. Grading median inslopes and installing high tension median cable guardrail. Temporary lane restrictions and shoulder closures.

last updated May 12
 
Roadwork - Interstate 94
Interstate 94 in both directions: from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75
road construction, bridge construction, delays — until December 15
Comment: I94 - MP 193- MP 195 - Bridge construction, grading, and paving. Intermittent lane closures and lane shifts. All directions are open to traffic. Could be some delay. For more information Click Here
last updated May 27
 
Roadwork - US 10
US 10 in both directions: from MN 15 to Sherburne County Road 20
road construction, paving operations, roadway reduced to one lane Width limit 10 ' 0 " — until December 1
Comment: Lane closures and multiple staging. Grading, concrete surfacing, bituminous overlay, light/signal systems. For more information Click Here

last updated July 6
 
Roadwork - US 10
US 10 in both directions: from after Sherburne County Road 52 to before Sherburne County Road 81
road maintenance operations, roadway reduced to one lane — until August 12
Comment: Between Big Lake and Becker from 8 a.m. - 3:30 p.m. Monday through Thursday there are single lane closures/shifts with reduced speeds. Crews will be pothole patching the roadway.

last updated July 27
 
Roadwork - US 71
US 71: from after Hubbard County Road 44 to MN 197, US 2
bridge construction, traffic restrictions in force because the route is temporarily closed to trucks with permits -- detour in operation, look out for flaggers, a mandatory speed limit is in force Width limit 11 ' 0 ", No vehicles over 80000 lbs — until June 15, 2011
Comment: On Hwy 197 in Bemidji to 1.7 miles south - Lane width restrictions, intermittent flag person, minor traffic delays. Detour on Hwy 71 starts July 6 through late August 2010. Detour: Hubbard Co.Rd. 9 north to Hubbard Co. Rd. 98 , then east to Beltrami Co. Rd. 2 to Hwy 71. SB traffic will use the same detour in reverse.DETOUR is posted for 9 Ton. Hwy 71 project home page

last updated July 6
 
Roadwork - US 71
US 71: from Beltrami County Road 2 to MN 197, US 2
work on underground services, road open to traffic
Comment: Utility Relocations. May be lane closures and minor delays. On MN 197 from County Rd 50 to Hwy 71S junction Beltrami County Rd 2.

last updated June 24
 
Roadwork - MN 15
MN 15 in both directions: from Stearns County Road 47 to I-94
road construction, paving operations, width limit in effect, length limit in effect Width limit 8 ' 6 ", Vehicle length limit 85.0 ft — until August 17
Comment: TH 15 - in St. Cloud - from N. of CR 47/136 in St. Augusta to N. of TH 23 in St. Cloud - mill and overlay - permits - no over width and no over length from N. of CR 47/136 in St. Augusta to I94. The other part has night paving. Highway 15 from N. of Highway 23/Division St. to S. of the intersection of Highway 23/2nd St. South in St. Cloud night work begins July 26th. For more information Click Here

last updated July 22
 
Roadwork - MN 15
MN 15: from after Stearns County Road 74 to before Stearns County Road 134
road maintenance operations — until August 17
Comment: Periodic lane closures for a resurfacing project on Hwy 15 from Hwy 23/Division Street in St. Cloud to Stearns County Hwy 47/136 in St. Augusta. Day work begins the week of July 6 which includes lane closures, reduced speeds, flaggers and a pilot car directing traffic in rural portions. Night work begins the week of July 19 which includes lane closures/shifts from 9 p.m. - 6 a.m., reduced speeds and flaggers directing traffic. For more information: Click Here

last updated June 25
 
Roadwork - MN 23
MN 23: from after South Junction with County Road 66 to before Stearns County Road 12 - County Road 43
road construction — until September 1, 2012
Comment: Construct a four-lane divided highway bypass of Paynesville to include bridges and lighting.

last updated May 10
 
Roadwork - MN 23
MN 23: from after MN 15 to before Benton County Road 8
road construction, roadway reduced to one lane — until Monday, at about 10:00 AM CDT
Comment: Hwy 23 at the intersection of 28th Avenue in Waite Park, will be reduced to a single lane for signal revisions and the construction of turn lanes .

last updated July 16
 
Roadwork - MN 25
MN 25 in both directions: from after MN 7 to before Wright County Road 112
road construction — until Tuesday, at about 10:30 AM CDT
Comment: Resurfacing the roadway. Detour between State Street and White Street. Motorists will follow a signed detour via highway 7, Carver County 21, Wright County 10 and Wright County 30. For more information: Click Here

last updated May 13
 
Roadwork - MN 25
MN 25: from after MN 27 to Morrison County Road 43 - County Road 39
road construction, closed for vehicles with permits -- detour in operation — until August 16
Comment: Access to businesses provided via side streets & accessible crossings. Detour: Hwy 27, Centennial Dr., 3rd Ave. N., Vincent St., 4th Ave. N. . Grading, paving, lighting & water main work. Hwy 27 at Pierz to northern city limits. No oversize, overweight vehicles.

last updated yesterday at 11:29 AM CDT
 
Roadwork - MN 34
MN 34: from after Becker County Road 29 to MN 225
road maintenance operations, roadway reduced to one lane, width limit in effect, delays -- pilot car in operation, look out for flaggers Width limit 12 ' 0 " — until August 4
Comment: Seal Coat project on Highway 34 from Becker County Road 29 to Highway 225 west of Osage.

last updated July 28
 
Roadwork - MN 87
MN 87: from Becker County Road 50 to before US 71
road maintenance operations, roadway reduced to one lane, width limit in effect, delays -- pilot car in operation, look out for flaggers Width limit 12 ' 0 " — until August 13
Comment: Seal Coat project on Highway 87 between Frazee and the east Becker County Line.

last updated yesterday at 4:18 PM CDT
 
Alert - MN 27
MN 27: from Morrison County Road 45 to MN 25
road closed to traffic, bridge construction -- detour in operation — until October 1
Comment: Reconstruction of Platte River Bridge, 3 miles West of Genola. Detour North of project via Morrison Co 45, Morrison County 43 and Morrison County Road 255. Legal Load Permits only per Morrison County. Detour Map: http://www.state.dot.mn.us/d3newsrel/2010/detours/Hwy27platteriverbridgedetour.pdf

last updated June 22
 
Alert - MN 55
MN 55: from Grant County Road 5 to Douglas County Road 151
road closed, road construction, bridge construction -- detour in operation, follow the detour signs — until September 3
Comment: Project Location: On Highway 55 between Hoffman and Kensington. Motorists are being detoured on Highway 27 and Douglas County Road 1. Highway 55 between Kensington and Glenwood is now open.

last updated July 16
 
Alert - MN 113
MN 113: from after US 59 to before Mahnomen County Road 100
surface water hazard — until Monday, at about 12:00 PM CDT

last updated today at 11:03 AM CDT
 
Alert - MN 113
MN 113: from after Mahnomen County Road 128 to before Mahnomen County Road 144
surface water hazard — until Monday, at about 12:00 PM CDT

last updated today at 11:03 AM CDT
 
Slow - US 10
US 10 in both directions: from Morrison County Road 13 to Morrison County Road 76
bridge construction, width limit in effect, delays, slow traffic, roadway reduced to two lanes, delays -- consider using an alternate route
Comment: Consider using an alternate route during this weekTraffic is restricted to a single lane is each direction with Flaggers. WB entrance ramp from Morrison CR 76 to WB Hwy 10 is closed. EB exit ramp to Morrison CR 76 is also closed. 12 ft. width restrictions in both directions. Wide loads may check Hwy 27 E or W or Hwy 115 N. at Camp Ripley or Hwy 371 N. to Hwy 210 E or W. DELAYS on Friday July 30, of 15 min each as new beams are being placed.

last updated yesterday at 11:05 AM CDT

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Disclaimer and legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

road closed to traffic, bridge construction on MN 27 from Morrison County Road 45 to MN 25 -- detour in operation — until October 1 last updated June 22 road closed, road construction, bridge construction on MN 55 from Grant County Road 5 to Douglas County Road 151 -- detour in operation, follow the detour signs — until September 3 last updated July 16 bridge construction, traffic restrictions in force on US 71 from after Hubbard County Road 44 to MN 197, US 2 because the route is temporarily closed to trucks with permits -- detour in operation, look out for flaggers, a mandatory speed limit is in force — until June 15, 2011 last updated July 6 road construction, paving operations, roadway reduced to one lane on US 10 in both directions from MN 15 to Sherburne County Road 20 — until December 1 last updated July 6 road construction, closed for vehicles with permits on MN 25 from after MN 27 to Morrison County Road 43 - County Road 39 -- detour in operation — until August 16 last updated yesterday at 11:29 AM CDT road construction, roadway reduced to one lane on MN 23 from after MN 15 to before Benton County Road 8 — until Monday, at about 10:00 AM CDT last updated July 16 road maintenance operations, roadway reduced to one lane on US 10 in both directions from after Sherburne County Road 52 to before Sherburne County Road 81 — until August 12 last updated July 27 road maintenance operations, roadway reduced to one lane, width limit in effect, delays on MN 34 from after Becker County Road 29 to MN 225 -- pilot car in operation, look out for flaggers — until August 4 last updated July 28 road maintenance operations, roadway reduced to one lane, width limit in effect, delays on MN 87 from Becker County Road 50 to before US 71 -- pilot car in operation, look out for flaggers — until August 13 last updated yesterday at 4:18 PM CDT road construction, bridge construction, delays on Interstate 94 in both directions from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75 — until December 15 last updated May 27 road construction, single line traffic - alternating directions, work in the median, width limit in effect on Interstate 94 in both directions from US 71 to MN 238 — until tomorrow at about 10:30 AM CDT last updated May 12 bridge construction, width limit in effect, delays, slow traffic, roadway reduced to two lanes, delays on US 10 in both directions from Morrison County Road 13 to Morrison County Road 76 -- consider using an alternate route last updated yesterday at 11:05 AM CDT road maintenance operations on MN 15 from after Stearns County Road 74 to before Stearns County Road 134 — until August 17 last updated June 25 road construction, paving operations, width limit in effect, length limit in effect on MN 15 in both directions from Stearns County Road 47 to I-94 — until August 17 last updated July 22 road construction on MN 25 in both directions from after MN 7 to before Wright County Road 112 — until Tuesday, at about 10:30 AM CDT last updated May 13 work on underground services, road open to traffic on US 71 from Beltrami County Road 2 to MN 197, US 2 last updated June 24 road construction on MN 23 from after South Junction with County Road 66 to before Stearns County Road 12 - County Road 43 — until September 1, 2012 last updated May 10 surface water hazard on MN 113 from after US 59 to before Mahnomen County Road 100 — until Monday, at about 12:00 PM CDT last updated today at 11:03 AM CDT surface water hazard on MN 113 from after Mahnomen County Road 128 to before Mahnomen County Road 144 — until Monday, at about 12:00 PM CDT last updated today at 11:03 AM CDT Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints