| Roadwork & Maintenance Activities By Month. |
| Roadwork - US 2 |
US 2: from after MN 197 to before Beltrami County Road 45 bridge maintenance operations — until August 1 Comment: Bemidji Bypass Bridge Rehab. on 6 bridges. Width Restriction 10'. Reduced speed lmt 65 to 55 mph. Crossovers to accommodate 2 lanes, head to head high speed vehicular traffic. Jefferson bridge to reopen July 6. last updated June 25 |
| |
| Roadwork - US 10 |
US 10 in both directions: from Sherburne County Road 16 to before Sherburne County Road 50 lane closed, construction traffic merging, major road construction Width limit 8 ' 6 " — until August 22 Comment: In Sherburne Co. on TH 10 - E. of TH 24 to W. of TH 25 - Big Lake. 2 way, 2 lane head to head traffic. No over width permits. Length of interference - 14 miles. For more information: Click Here last updated June 1 |
| |
| Roadwork - MN 23 |
MN 23 in both directions: from after Exit 164 to before MN 15 roadway reduced to one lane, road reconstruction, utility work — until July 10 Comment: Motorists should expect lane closures on Highway 23 - at Bel Clare Drive - W. of Waite Park - starting 5/31/12 and lasting through the end of June. Crews will extend turn/acceleration lanes & install overhead intersection lighting. For more information: Click Here last updated June 1 |
| |
| Roadwork - MN 23 |
MN 23 in both directions: from after Benton County Road 1 to before MN 95 road closed to traffic, detour in operation, bridge construction, roadway reduced to one lane Width limit 8 ' 6 " — until September 11 Comment: TH 23 in St. Cloud - E. of Cooper Ave. will encounter lane closures and a nighttime detour because of a pedestrian bridge project. Detour - Wilson Ave. - E. St. Germain St. - Lincoln Ave. . Please visit: Click Here last updated June 1 |
| |
| Roadwork - MN 23 |
MN 23 in both directions: from MN 95 to MN 25 road closed, detour in operation, road reconstruction, single line traffic - alternating directions — until December 21 Comment: Motorists may encounter lane closures on Highway 23 from 95 - E. of St. Cloud to Highway 25 in Foley - four-lane expansion. No restrictions for OSOW vehicles. For more information: Click Here last updated June 1 |
| |
| Roadwork - MN 29 |
MN 29: from after MN 9, US 12 to before MN 114, MN 28 road construction Width limit 12 ' 6 " — until July 19 Comment: Culvert replacement, frost heave repair and resurfacing project. Watch for lane closures, uneven lanes. last updated today at 2:34 PM CDT |