| Roadwork & Maintenance Activities By Month. |
| Roadwork - Interstate 35 |
Interstate 35: from Exit 191: MN 23; Railroad Avenue to Exit 205 Pine County Road 43 road construction, width limit in effect, single line traffic - alternating directions, delays of uncertain duration Width limit 12 ' 0 " — until October 31 Comment: On I-35 from Sandstone to Willow River one lane each way through the construction zone. Backups expected NB Fridays and SB on Sundays. last updated June 11 |
| |
| Roadwork - Interstate 35 |
Interstate 35: from after MN 73 to Exit 220 Carlton County Road 6 road construction, width limit in effect, roadway reduced to one lane, single line traffic - alternating directions, delays of uncertain duration Width limit 12 ' 0 " — until August 15 Comment: On I-35 between Moose Lake and Barnum, one lane each way through the construction zone. Back-ups anticipated in NB lanes Fridays and SB lanes Sundays. last updated June 11 |
| |
| Roadwork - Interstate 35 |
Interstate 35 northbound: from Exit 245 Carlton County Road 61 to Exit 259 London Road road construction, speed restrictions in force, roadway reduced to one lane Speed limit 45 MPH — until June 29 Comment: In Duluth on I-35, the ramp from NB 535 to NB I-35 will close and be detoured starting May 29th. Detour will be marked. Left lane closures between Grand Avenue and 44th Avenue west in West Duluth and the Garfield Avenue location. Right lane closed on SB I-35 between 21st avenue and 27th Avenue West. Traffic backups may develop and motorists are urged to pay close attention to the traffic conditions. No width restrictions for OSOW vehicles. For more details Click Here last updated June 14 |
| |
| Roadwork - Interstate 94 |
Interstate 94 westbound: from Exit 201 Wright County Road 19 to before MN 241 lane closed, road reconstruction Width limit 11 ' 0 " — until December 13 Comment: I94 - WB - thru Albertville between 241 & CR 19 - from 8:00 p.m. - 9:00 a.m. the City of Albertville is doing construction. Nothing over 11 ft. wide is permitted. For more information: Click Here last updated June 1 |
| |
| Roadwork - US 8 |
US 8: from after Chisago County Road 77 to before Chisago County Road 32 delays due to road construction work Width limit 11 ' 0 " — until December 1 Comment: OSOW Restrictions - 11' wide lanes. Work Zone area is from Shoquist Ln to Irene Ave. in Lindstrom. last updated May 29 |
| |
| Roadwork - US 10 |
US 10 in both directions: from Sherburne County Road 16 to before Sherburne County Road 50 lane closed, construction traffic merging, major road construction Width limit 8 ' 6 " — until August 22 Comment: In Sherburne Co. on TH 10 - E. of TH 24 to W. of TH 25 - Big Lake. 2 way, 2 lane head to head traffic. No over width permits. Length of interference - 14 miles. For more information: Click Here last updated June 1 |
| |
| Roadwork - US 53 |
US 53 in both directions: from St Louis County Road 7 to MN 33 road construction, width limit in effect, roadway reduced to one lane -- approach with care Width limit 12 ' 0 " — until August 14 Comment: On MN 53 bridge reconstruction at Independence, single lane traffic in each direction onto the SB lanes. last updated June 14 |
| |
| Roadwork - US 53 |
US 53 southbound: from St Louis County Road 7 to MN 33 bridge construction, width limit in effect, roadway reduced to one lane -- observe the recommended speed Width limit 12 ' 0 " — until August 14 Comment: NB MN 33 is bypassed onto SB 53 and be in a single lane with SB traffic. NB MN 53 is open. No restrictions on for OSOW on NB MN 53. last updated June 19 |
| |
| Roadwork - US 53 |
US 53: from St Louis County Road 94 to St Louis County Road 967 road construction, width limit in effect, roadway reduced to one lane -- reduce your speed, observe the recommended speed Width limit 12 ' 0 " — until August 28 Comment: On MN53 in Cotton and Paleface River bridge, NB and SB single lane traffic in each direction. OSOW loads wider than 12' need District approval. For more details Click Here last updated June 19 |
| |
| Roadwork - US 169 |
US 169 in both directions: from after Itasca County Road 66 to US 2 construction work, width limit in effect, roadway reduced to one lane -- trucks are recommended to avoid the area Width limit 12 ' 0 " — until October 2 Comment: On US169 in Grand Rapids, pavement removal and water main installation at 1 St S. Traffic reduced to one lane in each direction and routed on the east side of US169 between the Mississippi River and 7th St So. Access to 2nd St. SW, 4th St SW, and 6th St. SW will be closed at US169. All way stop signs will be installed at 10th St S., 7th St. S. and 1st St. S. Traffic signal at 10th St. S. will be taken out of service until September. OS/OW vehicles recommended to use truck route. See map. No restrictions for OS/OW vehicles on the truck route. last updated June 8 |
| |
| Roadwork - MN 23 |
MN 23 in both directions: from after Exit 164 to before MN 15 roadway reduced to one lane, road reconstruction, utility work — until July 10 Comment: Motorists should expect lane closures on Highway 23 - at Bel Clare Drive - W. of Waite Park - starting 5/31/12 and lasting through the end of June. Crews will extend turn/acceleration lanes & install overhead intersection lighting. For more information: Click Here last updated June 1 |
| |
| Roadwork - MN 23 |
MN 23 in both directions: from after Benton County Road 1 to before MN 95 road closed to traffic, detour in operation, bridge construction, roadway reduced to one lane Width limit 8 ' 6 " — until September 11 Comment: TH 23 in St. Cloud - E. of Cooper Ave. will encounter lane closures and a nighttime detour because of a pedestrian bridge project. Detour - Wilson Ave. - E. St. Germain St. - Lincoln Ave. . Please visit: Click Here last updated June 1 |
| |
| Roadwork - MN 23 |
MN 23 in both directions: from MN 95 to MN 25 road closed, detour in operation, road reconstruction, single line traffic - alternating directions — until December 21 Comment: Motorists may encounter lane closures on Highway 23 from 95 - E. of St. Cloud to Highway 25 in Foley - four-lane expansion. No restrictions for OSOW vehicles. For more information: Click Here last updated June 1 |
| |
| Roadwork - MN 24 |
MN 24 in both directions: from I-94 to US 10 lane closed, single line traffic - alternating directions, paving operations Width limit 12 ' 6 " from 10:00am CDT to 06:00pm CDT daily — until July 10 Comment: Paving 4-lane roadways, traffic will shift to 1-lane thru the work zone and be directed by flaggers. Pilot cars will be utilized on 2-lane roadways. Road surfacing/intermittent lane closures. Please visit: Click Here last updated June 1 |
| |
| Roadwork - MN 47 |
MN 47 in both directions: from MN 27 to MN 27 road closed to traffic, detour in operation, paving operations — until June 29 Comment: TH 27 - culvert replacements, bituminous milling & surfacing. No thru traffic - flaggers - detour - . "No OSOW Restrictions." Please visit: Click Here last updated June 1 |
| |
| Roadwork - MN 210 |
MN 210: from after Aitkin County Road 62 to MN 65 road construction, width limit in effect, short delays Width limit 11 ' 0 " — until August 24 Comment: On MN 210 from McGregor to I-35, motorists can anticipate short intermittent full closures with flagging operations not longer than 15 minutes. Width restriction only in the McGregor area between MN65 and south junction of MN65 due to single lane closures. last updated yesterday at 2:51 PM CDT |