 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Critical Incidents |
 |
Road Conditions |
 |
Roadwork |
 |
All |
 |
Weather |
 |
Commercial Vehicles |
 |
|
|
|
|
|
|
| Commercial Vehicle Permits And Restrictions. |
| Permit Status - Interstate 35 |
Interstate 35: from Exit 245 Carlton County Road 61 to Exit 249 Boundary Avenue roadway reduced to one lane, road construction, exit ramp closed, width limit in effect, speed restrictions in force Width limit 12 ' 0 ", Speed limit 55 MPH — until October 21 Comment: On I-35 between MN 45 in Scanlon to MN 2 in Proctor. Single lane traffic NB and SB in right lanes to construct cross overs. The ramps at exit 245 CSAH 61 will be closed . Marked detour routes will be posted using exit 246 Midway Road. last updated May 8 |
| | | Permit Status - US 169 |
US 169: from after US 2 to before Itasca County Road 21 roadway reduced to one lane, construction work, width limit in effect Width limit 12 ' 0 " — until September 2 Comment: On MN 169 in Grand Rapids turn lanes to Glenwood Drive will be closed and traffic will be reduced to one lane in both directions. last updated May 13 |
| | | Permit Status - MN 23 |
MN 23: from MN 210 to Raleigh Street roadway reduced to one lane, width limit in effect, single line traffic - alternating directions Width limit 11 ' 0 " — until June 17 Comment: On MN 23 near Fond Du Lac, both directions of traffic will be carried head to head in the NB lanes for one week then switch to the SB lanes. last updated May 16 |
| | | Permit Status - MN 210 |
MN 210: from MN 45 to before Carlton County Road 1 roadway reduced to one lane, width limit in effect, temporary traffic lights -- observe the recommended speed Width limit 16 ' 0 " — until October 1 Comment: On MN 210 repair work will resume on roadway and bridge over the St. Louis River. A temporary signal system will be used to direct traffic one lane. last updated May 16 |
|
|