 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Critical Incidents |
 |
Road Conditions |
 |
Roadwork |
 |
All |
 |
Weather |
 |
Commercial Vehicles |
 |
|
|
|
 |
Roadwork |
|
|
| |
| Roadwork & Maintenance Activities By Month. |
| Roadwork - US 2 |
US 2: from after MN 197 to before Beltrami County Road 45 bridge maintenance operations — until August 1 Comment: Bemidji Bypass Bridge Rehab. Width Restriction 10'. Reduced speed lmt 65 to 55 mph. Crossovers to accommodate 2 lanes, head to head high speed vehicular traffic. last updated June 11 |
| | | Roadwork - US 53 |
US 53: from St Louis County Road 94 to St Louis County Road 967 road construction, width limit in effect, roadway reduced to one lane -- reduce your speed, observe the recommended speed Width limit 12 ' 0 " — until August 28 Comment: On MN53 in Cotton and Paleface River bridge, NB and SB single lane traffic in each direction. OSOW loads wider than 12' need District approval. For more details Click Here last updated June 19 |
| | | Roadwork - US 169 |
US 169 in both directions: from after Itasca County Road 66 to US 2 construction work, width limit in effect, roadway reduced to one lane -- trucks are recommended to avoid the area Width limit 12 ' 0 " — until October 2 Comment: On US169 in Grand Rapids, pavement removal and water main installation at 1 St S. Traffic reduced to one lane in each direction and routed on the east side of US169 between the Mississippi River and 7th St So. Access to 2nd St. SW, 4th St SW, and 6th St. SW will be closed at US169. All way stop signs will be installed at 10th St S., 7th St. S. and 1st St. S. Traffic signal at 10th St. S. will be taken out of service until September. OS/OW vehicles recommended to use truck route. See map. No restrictions for OS/OW vehicles on the truck route. last updated June 8 |
| | | Roadwork - MN 11 |
MN 11: from MN 72 to before Koochiching County Road 4 road closed to traffic, detour in operation, road reconstruction — until August 29 Comment: Road closed from Jct. TH 72 to Clementson. Detour in effect on gravel roads. Eastbound from Baudette go S on Hwy 72 2.5 miles, then E on Lake of Woods Cty Rd 19 4 miles, N on Cty Rd 19 1.5 miles to Hwy 11 W of Clementson. 10 TON PERMIT needed on Cty Rd 19. Work includes culvert replacement, shoulder widening , curve realignment, and resurfacing. Slow Down! Use Caution! last updated June 11 |
|
|