Home | Getting Around | 511 Traveler Info |
Mn/DOT A to Z | Contact | Search |
Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  Cameras  
 All Current Incidents   Text Only
 
Accident
Alert
Closure
Roadwork
Difficult Driving
Fair Driving

North Central
Central East Central
 
All Current Incidents
Roadwork - Interstate 35
Interstate 35: from Exit 249 Boundary Avenue to Exit 258 21st Avenue East
major road construction, width limit in effect, speed restrictions in force, roadway reduced to one lane -- trucks are recommended to avoid the area, drive with extreme caution Width limit 11 ' 0 ", Advisory speed limit 45 MPH — until October 30
Comment: In Duluth from Boundary Avenue to 21st Avenue East, all traffic will be switched onto the NB lanes of I-35. Motorists are urged to proceed with caution due to construction activities and ramp closures. For more information CLICK HERE

last updated June 24
 
Roadwork - MN 61
MN 61: from I-35 to Saint Louis County Road 281
bridge construction, road closed to traffic, width limit in effect, length limit in effect -- follow the detour signs Width limit 12 ' 0 " — until October 1
Comment: In Duluth at the Lester River bridge, traffic will be detoured from 60th Avenue East to Superior Street.

last updated yesterday at 10:22 AM CDT
 
Roadwork - MN 61
MN 61: from Saint Louis County Road 33 to Lake County Road 3
road construction, width limit in effect, roadway reduced to one lane, short delays -- look out for flaggers Width limit 14 ' 0 " — until August 27
Comment: TH 61 from Duluth to 4 miles north of Two Harbors. Single lane road with flaggers on two-lane portions; lane closures on the 4-lane part of the project.

last updated July 12
 
Roadwork - MN 61
MN 61: from Lake County Road 106 to Lake County Road 4
road construction, width limit in effect, speed restrictions in force, roadway reduced to one lane Width limit 14 ' 0 ", Advisory speed limit 45 MPH — until today at about 6:00 PM CDT
Comment: Between Two Harbors and Beaver Bay single lane traffic with flaggers. Delays up to 15 minutes for rock blasting when blasting begins. Watch for contractor trucks entering and leaving the construction zone. Wider loads will need district approval.

last updated July 21
 
Roadwork - MN 135
MN 135: from MN 37 to MN 1
road construction, width limit in effect, single line traffic - alternating directions -- look out for flaggers Width limit 12 ' 0 " — until August 30
Comment: On TH 135 between Gilbert and Tower, various sections of the highway will be reduced to one lane for culvert repair.

last updated July 21
 
Roadwork - MN 135
MN 135: from MN 37 to Heritage Trail
road construction, bridge maintenance operations, width limit in effect, speed restrictions in force Width limit 13 ' 0 ", Speed limit 45 MPH — until August 6
Comment: Bridge rail replacement on Hwy 135 near Gilbert. Lane closures and reduced speed.

last updated June 21
 
Alert - Interstate 35
Interstate 35 southbound: from Exit 252 Central Avenue to US 2
entrance ramp closed, major road construction — until October 30
Comment: Central Avenue ramp to SB I-35 is closed, detour to Cody St. to SB I-35.

last updated July 27
 
Alert - Interstate 35
Interstate 35 southbound: from Exit 254 27th Avenue West to I-535, US 53
entrance ramp closed, major road construction — until August 30
Comment: In Duluth, the SB I-35 ramp to Wisconsin I-535 will be closed . Detour to Wisconsin will be NB Hwy 53 to 21st Avenue W to 1st St. , to SB Hwy 53 to I-535.

last updated June 24
 
Alert - Interstate 35
Interstate 35: at I-535, US 53
exit ramp closed, major road construction — until October 30
Comment: On I-35 NB ramp to NB Hwy 53 - is closed, detour to 5th Avenue W & loop back. NB I-35 ramp to SB TH 535 to Superior is closed, detour to Hwy 2 or 27th Avenue W to Michigan St. to 21st Avenue W to I-535.

last updated July 27
 
Alert - Interstate 35
Interstate 35: from Exit 258 21st Avenue East to MN 61
road closed to traffic, major road construction, width limit in effect, length limit in effect -- follow the detour signs — until October 30
Comment: In Duluth traffic will be detoured off NB I-35 at the 21st Avenue east exit ramp. Traffic will follow marked detour route to London Road. SB I-35 traffic will enter the freeway at 21st Avenue East. An addditional detour will be placed on London Road. Southbound traffic will be routed to Superior St. at 40th Avene east

last updated yesterday at 10:12 AM CDT
 
Alert - US 2
US 2: from Skyline Drive to I-35
entrance ramp closed, road construction — until October 22
Comment: WB TH 2 ramp to SB I-35 is closed, detour to 1st St. to 40th Avenue West to I-35 NB or use Blatnik Bridge.

last updated July 27
 
Alert - US 53
US 53 southbound: from I-35, I-535 to Exit 255A 21st Avenue West
entrance ramp closed, road construction -- follow local detour, consider using an alternate route — until August 9
Comment: In Duluth, the southbound ramp from TH 53 to the Blatnik Bridge will be closed for 14 days. Traffic will be detoured to Garfield Avenue and back to the Blatnik Bridge.

last updated July 27
 
Alert - MN 135
MN 135: from Heritage Trail to Vermilion Trail
road open to traffic, paving operations, short delays — until today at about 6:00 PM CDT

last updated yesterday at 10:09 AM CDT

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Disclaimer and legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

road closed to traffic, major road construction, width limit in effect, length limit in effect on Interstate 35 from Exit 258 21st Avenue East to MN 61 -- follow the detour signs — until October 30 last updated yesterday at 10:12 AM CDT bridge construction, road closed to traffic, width limit in effect, length limit in effect on MN 61 from I-35 to Saint Louis County Road 281 -- follow the detour signs — until October 1 last updated yesterday at 10:22 AM CDT major road construction, width limit in effect, speed restrictions in force, roadway reduced to one lane on Interstate 35 from Exit 249 Boundary Avenue to Exit 258 21st Avenue East -- trucks are recommended to avoid the area, drive with extreme caution — until October 30 last updated June 24 road construction, width limit in effect, speed restrictions in force, roadway reduced to one lane on MN 61 from Lake County Road 106 to Lake County Road 4 — until today at about 6:00 PM CDT last updated July 21 entrance ramp closed, major road construction on Interstate 35 southbound from Exit 252 Central Avenue to US 2 — until October 30 last updated July 27 road construction, width limit in effect, roadway reduced to one lane, short delays on MN 61 from Saint Louis County Road 33 to Lake County Road 3 -- look out for flaggers — until August 27 last updated July 12 entrance ramp closed, road construction on US 53 southbound from I-35, I-535 to Exit 255A 21st Avenue West -- follow local detour, consider using an alternate route — until August 9 last updated July 27 entrance ramp closed, road construction on US 2 from Skyline Drive to I-35 — until October 22 last updated July 27 road construction, width limit in effect, single line traffic - alternating directions on MN 135 from MN 37 to MN 1 -- look out for flaggers — until August 30 last updated July 21 road construction, bridge maintenance operations, width limit in effect, speed restrictions in force on MN 135 from MN 37 to Heritage Trail — until August 6 last updated June 21 exit ramp closed, major road construction on Interstate 35 at I-535, US 53 — until October 30 last updated July 27 entrance ramp closed, major road construction on Interstate 35 southbound from Exit 254 27th Avenue West to I-535, US 53 — until August 30 last updated June 24 road open to traffic, paving operations, short delays on MN 135 from Heritage Trail to Vermilion Trail — until today at about 6:00 PM CDT last updated yesterday at 10:09 AM CDT Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints