Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  
 Commercial Vehicle Permits And Restrictions.   Text Only
 

North Central
West Central Central
 
Commercial Vehicle Permits And Restrictions.
Permit Status - US 2
US 2: from before North Dakota Line to before Polk County Road 17
roadway reduced to two lanes, paving operations, width limit in effect, delays Width limit 11 ' 0 " — until July 27
Comment: 11 foot width restriction is from June 20th to July 27th only. This project is from the ND border to 1.5 miles east.

last updated June 12
 
Permit Status - US 2
US 2 eastbound: from MN 220 to MN 220
roadway reduced to two lanes, narrow lanes, width limit in effect, paving operations, delays -- a mandatory speed limit is in force Width limit 11 ' 0 " — until July 27
Comment: This is from the intersection of US 2 and MN 220 in EGF to the technical college. 11 foot width restriction.

last updated May 21
 
Permit Status - US 2
US 2: from Polk County Road 11 to Polk County Road 9
roadway reduced to two lanes, paving operations, width limit in effect, delays -- reduce your speed, consider using an alternate route Width limit 11 ' 0 " — until July 27
Comment: 11 foot width restriction. Public encouraged to take alternate routes around Crookston. This is from the east end of Crookston to the west end. Polk county road 9 to US 75 by-pass will by-pass this project.

last updated May 21
 
Permit Status - MN 200
MN 200: from North Dakota State Line to US 75
paving operations, width limit in effect — until July 27
Comment: This project is by Halstad. Expect a 7 calendar day detour from July 7 to July 27. Traffic will be detoured on Norman County 147. 11 foot width restriction on detour. Expect delays.

last updated June 12
 
Permit Status - MN 200
MN 200: from after MN 64 to before Hubbard County Road 71
road closed to traffic, road maintenance operations, detour in operation, axle load limit in effect, width limit in effect — until August 19
Comment: Grading, bituminous surfacing. Road closure and detour to begin 5/28 - 8/19. See detour route on map....follow signage for detour. Reduce speed on two lane county roads. No over width travel on detour. Weight restricted to 10 ton axle loads.

last updated June 4
 
Alert - MN 89
MN 89 in both directions: from after Roseau County Road 122 to before Roseau County Road 131
bridge closed, bridge construction, detour in operation, overloads are not permitted — until August 30
Comment: This is located 4.6 miles south of Wannaska over the South Fork Roseau River. 9 ton weight restriction on detour roads. Detour route is Roseau County 4, Roseau County 9, Marshall County 54/Beltrami CSAH1 and Marshall County 6.

last updated May 31

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About MnDOT | Disclaimer and legal | Doing Business | Contact MnDOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

road closed to traffic, road maintenance operations, detour in operation, axle load limit in effect, width limit in effect on MN 200 from after MN 64 to before Hubbard County Road 71 — until August 19 last updated June 4 bridge closed, bridge construction, detour in operation, overloads are not permitted on MN 89 in both directions from after Roseau County Road 122 to before Roseau County Road 131 — until August 30 last updated May 31 roadway reduced to two lanes, paving operations, width limit in effect, delays on US 2 from before North Dakota Line to before Polk County Road 17 — until July 27 last updated June 12 roadway reduced to two lanes, paving operations, width limit in effect, delays on US 2 from Polk County Road 11 to Polk County Road 9 -- reduce your speed, consider using an alternate route — until July 27 last updated May 21 paving operations, width limit in effect on MN 200 from North Dakota State Line to US 75 — until July 27 last updated June 12 roadway reduced to two lanes, narrow lanes, width limit in effect, paving operations, delays on US 2 eastbound from MN 220 to MN 220 -- a mandatory speed limit is in force — until July 27 last updated May 21
Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints