Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  
 Roadwork & Maintenance Activities By Month.   Show Map
 

Roadwork & Maintenance Activities By Month.
Roadwork - US 10
US 10: from North Dakota State Line to US 75
road construction because of construction work Width limit 11 ' 0 " — starting 12:00 AM, 05/20/13 until September 30
Comment: Intermittent lane closures due to signal replacements, pedestrian accessibility improvements and resurfacing. 11-foot width restriction.

last updated May 13
 
Roadwork - US 10
US 10: from US 75 to before Clay County Road 82
road construction because of construction work Width limit 11 ' 0 " — starting 12:00 AM, 05/20/13 until September 30
Comment: Intermittent lane closures due to signal replacements and pedestrian accessibility improvements. 11-foot width restriction.

last updated May 13
 
Roadwork - US 10
US 10 in both directions: from after Clay County Road 113 to 6th Street
roadway reduced to one lane due to road construction work Width limit 12 ' 0 " — starting 12:00 AM, 05/20/13 until September 30
Comment: Lane closures for an intersection modification and traffic signal installation project at Co Rd 31/33.

last updated May 13
 
Roadwork - US 10
US 10 in both directions: from after Becker County Road 5 to before Morrow Avenue
roadway reduced to one lane due to road construction work Width limit 12 ' 0 " — until August 2
Comment: Two-lane, two-way traffic due to a resurfacing project. 12' OW limit.

last updated May 2
 
Roadwork - US 10
US 10 in both directions: from Becker County Road 22 to before Becker County Road 10
roadway reduced to one lane due to road construction work Width limit 12 ' 0 " — starting 12:00 AM, 05/28/13 until June 28
Comment: Two-way traffic. DNR box culvert installation.

last updated May 13
 
Roadwork - US 59
US 59: from after MN 55, MN 79 to before I-94
road closed, detour in operation due to road construction work -- follow the detour signs — starting 12:00 AM, 05/20/13 until July 5
Comment: Resurfacing project. NO OVERWEIGHT VEHICLES ON DETOUR Detour: from I-94 take Exit 55, the Wendell Road. The detour will follow Otter Tail County Road 1/Grant County Road 11, Grant County Road 1/25 and Highway 54 to Elbow Lake.

last updated May 2
 
Roadwork - US 71
US 71: from after MN 27 to before Todd County Road 24
construction work — until July 19

last updated May 10
 
Roadwork - US 75
US 75: from MN 9 to Wilkin County Road 20
road construction -- look out for flaggers, pilot car in operation Width limit 12 ' 0 " — until June 28
Comment: Resurfacing project. Expect lane closures with flaggers and pilot cars. 12' OW limit.

last updated May 2
 
Roadwork - US 75
US 75: from after Exit 1A to US 10
road construction because of construction work Width limit 11 ' 0 " — starting 12:00 AM, 05/20/13 until September 30
Comment: Comment: Intermittent lane closures due to signal replacements and pedestrian accessibility improvements. 11-foot width restriction.

last updated May 13
 
Roadwork - MN 7
MN 7: from after MN 119 to before MN 29
road construction, traffic is being held. Expect delays -- pilot car in operation, look out for flaggers — until July 8
Comment: Bituminous Overlay with Shoulder Reclamation & High Tension Cable Guardrail

last updated May 1
 
Roadwork - MN 28
MN 28 in both directions: from Stearns County Road 26 to US 71
single line traffic - alternating directions, paving operations Width limit 12 ' 0 " — until June 19
Comment: For more detailed information on this project: Click Here

last updated April 24
 
Roadwork - MN 29
MN 29: from after Pope County Road 18 to before MN 114, MN 28
road construction, shoulder closed — until May 31
Comment: Bridge work completion: Crews will finish the multi-use trail, lighting and concrete curb and gutter, finish the final layer of asphalt and paint the new bridge. No OSOW restrictions

last updated May 2
 
Roadwork - MN 200
MN 200: from North Dakota State Line to US 75
detour in operation, paving operations, width limit in effect — starting 6:00 AM, 05/28/13 until July 27
Comment: This project is by Halstad. Traffic will be detoured on Norman County 147. 11 foot width restriction on detour. Expect delays.

last updated yesterday at 10:56 AM CDT
 
Roadwork - MN 200
MN 200: from after MN 64 to before Hubbard County Road 39
road maintenance operations, road closed to traffic, detour in operation — until August 19
Comment: Grading, bituminous surfacing. Road closure and detour to begin 5/28 - 8/19. Two Way Detour: cty #39 NE to cty #45 N to cty 16 W cty 36 S. No restrictions until detour in effect.

last updated April 29

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About MnDOT | Disclaimer and legal | Doing Business | Contact MnDOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints