Home | Getting Around | 511 Traveler Info |
Mn/DOT A to Z | Contact | Search |
Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  
 All Current Incidents   Text Only
 
Accident
Alert
Closure
Roadwork
Difficult Driving
Fair Driving
Good Driving

For Minneapolis/St. Paul information, click on the map or select Minneapolis/St. Paul.
All Current Incidents
Roadwork - Interstate 35
Interstate 35 in both directions: at MN 95
road construction, roadway reduced to one lane on Friday — until today at about 6:00 PM CST
Comment: Alternating lanes will be closed in both directions. Closure is 1/2 mile South to 1/2 mile North of 95.

last updated today at 8:12 AM CST
 
Roadwork - Interstate 94
Interstate 94 in both directions: from MN 127 to MN 15
road construction — until December 15
Comment: Replacing signs on Inerstate - from Highway 15 - in St. Cloud to Osakis - Todd/Stearns Co. Line. Does not interfere with traffic. Both directions. Please visit

last updated September 4
 
Roadwork - US 53
US 53: from St Louis County Road 91 to MN 194
road construction, width limit in effect -- approach with care Width limit 12 ' 0 " — until November 30
Comment: Traffic will travel slower through the construction zone. Motorists are urged to use extreme caution while traveling through the mall area.

last updated November 10
 
Roadwork - US 53
US 53 southbound: from MN 194 to MN 33
road construction, width limit in effect Width limit 12 ' 0 " — until Monday, at about 6:00 PM CST
Comment: TH 53 from Pike Lake to Independence. Soutbound traffic reduced to one lane. Traffic may experience haul trucks entering and leaving the project.

last updated November 16
 
Roadwork - US 169
US 169 in both directions: from after Nicollet County Road 28 to before MN 22
road construction -- trucks are recommended to avoid the area Width limit 12 ' 0 " — until November 30
Comment: The southbound truck detour is Hwy 22 N to Nicollet Co Rd 15 to Nicollet Co Rd 40 to Hwy 99 E to Hwy 169; the northbound truck detour is Hwy 99 W to Nicollet Co Rd 40 to Nicollet Co Rd 15 to Hwy 22 N to Hwy 169. For questions, please visit:Click Here or Click Here. The truck detour is restricted to 12 ft. wide.

last updated November 17
 
Alert - Interstate 90
Interstate 90 eastbound: from Exit 272 to Exit 275
roadway reduced to one lane, bridge construction, width limit in effect Width limit 14 ' 0 " — until today at about 5:00 PM CST

last updated today at 11:42 AM CST
 
Alert - Interstate 90
Interstate 90 westbound: from Exit 272 to Exit 275
roadway reduced to one lane, bridge construction, width limit in effect Width limit 12 ' 0 " — until today at about 5:00 PM CST

last updated today at 11:43 AM CST
 
Alert - US 2
US 2: from MN 9 to before Polk County Road 48
roadway reduced to two lanes, width limit in effect, long term road construction, emergency maintenance -- a mandatory speed limit is in force Width limit 8 ' 6 "
Comment: Westbound traffic will crossover to Eastbound lane creating a two way two lane highway for 3300 feet. This will remain in effect until further notice.

last updated November 3

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Disclaimer and legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

Zoom In To Minneapolis/St. Paul Area
roadway reduced to one lane, bridge construction, width limit in effect on Interstate 90 eastbound from Exit 272 to Exit 275 — until today at about 5:00 PM CST last updated today at 11:42 AM CST roadway reduced to one lane, bridge construction, width limit in effect on Interstate 90 westbound from Exit 272 to Exit 275 — until today at about 5:00 PM CST last updated today at 11:43 AM CST road construction, roadway reduced to one lane on Interstate 35 in both directions at MN 95 — until today at about 6:00 PM CST last updated today at 8:12 AM CST roadway reduced to two lanes, width limit in effect, long term road construction, emergency maintenance on US 2 from MN 9 to before Polk County Road 48 -- a mandatory speed limit is in force last updated November 3 road construction on US 169 in both directions from after Nicollet County Road 28 to before MN 22 -- trucks are recommended to avoid the area — until November 30 last updated November 17 road construction on Interstate 94 in both directions from MN 127 to MN 15 — until December 15 last updated September 4 road construction, width limit in effect on US 53 from St Louis County Road 91 to MN 194 -- approach with care — until November 30 last updated November 10 road construction, width limit in effect on US 53 southbound from MN 194 to MN 33 — until Monday, at about 6:00 PM CST last updated November 16 Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints