Home | Getting Around | 511 Traveler Info |
Mn/DOT A to Z | Contact | Search |
Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  
 All Current Incidents   Text Only
 
Accident
Alert
Closure
Roadwork
Difficult Driving
Fair Driving

For Minneapolis/St. Paul information, click on the map or select Minneapolis/St. Paul.
All Current Incidents
Roadwork - Interstate 35
Interstate 35: at MN 95
bridge construction — until November 1
Comment: Removing and replacing the Hwy 95 bridge spanning I 35. For more information CLICK HERE

last updated June 24
 
Roadwork - Interstate 35
Interstate 35: at MN 95
bridge construction, roadway reduced to one lane from 09:00am CDT to 03:00pm CDT on weekdays
Comment: Bridge work on substructures.

last updated June 29
 
Roadwork - Interstate 35
Interstate 35: from Exit 249 Boundary Avenue to Exit 258 21st Avenue East
major road construction, width limit in effect, speed restrictions in force, roadway reduced to one lane -- trucks are recommended to avoid the area, drive with extreme caution Width limit 11 ' 0 ", Advisory speed limit 45 MPH — until October 30
Comment: In Duluth from Boundary Avenue to 21st Avenue East, all traffic will be switched onto the NB lanes of I-35. Motorists are urged to proceed with caution due to construction activities and ramp closures. For more information CLICK HERE

last updated June 24
 
Roadwork - Interstate 90
Interstate 90 westbound: from after MN 56 to MN 16
road construction, roadway reduced to one lane, width limit in effect Width limit 10 ' 0 " — until September 15
Comment: Concrete Pavement Rehabilitation, Grinding and Biruminous Should Replacement

last updated July 9
 
Roadwork - Interstate 90
Interstate 90 in both directions: from MN 74 to before Exit 257
single line traffic - alternating directions, major road construction, width limit in effect Width limit 12 ' 0 " — until August 31
Comment: Unbonded Concrete Overlay, Bridge & Culvert repair - I90 Eastbound from 2.2 miles East of Hwy 74 to 0.5 miles E of the W Jct Hwy 43 - May 3-13 East and westbound will have temporary and permanent lane closures - May 13 for duration, East and westbound will be one lane in each direction in the westbound lanes.

last updated June 7
 
Roadwork - Interstate 94
Interstate 94 in both directions: from before North Dakota State Line to before US 75
bridge maintenance operations, width limit in effect, roadway reduced to one lane Width limit 12 ' 0 " — until August 15
Comment: On Interstate 94 eastbound and westbound from the Red River Bridge in Clay County to approximately 1/2 mile east will experience lane shifts across the bridges. Temporary lane restrictions will not be permitted between 6 a.m. and 8 a.m. and again during 4 p.m. and 6 p.m. during peak traffic flows.

last updated July 12
 
Roadwork - Interstate 94
Interstate 94 in both directions: from US 71 to MN 238
road construction, single line traffic - alternating directions, work in the median, width limit in effect Width limit 14 ' 0 " daily — until tomorrow at about 10:30 AM CDT
Comment: For more information:Click Here. Grading median inslopes and installing high tension median cable guardrail. Temporary lane restrictions and shoulder closures.

last updated May 12
 
Roadwork - Interstate 94
Interstate 94 in both directions: from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75
road construction, bridge construction, delays — until December 15
Comment: I94 - MP 193- MP 195 - Bridge construction, grading, and paving. Intermittent lane closures and lane shifts. All directions are open to traffic. Could be some delay. For more information Click Here
last updated May 27
 
Roadwork - US 10
US 10: from US 75 to Clay County Road 82
work on underground services, roadway reduced to one lane, width limit in effect Width limit 11 ' 0 " — until Monday, at about 5:00 PM CDT
Comment: Directional boring across Highway 10 underground cables placement. Cut street to expose existing utilities.

last updated yesterday at 9:16 AM CDT
 
Roadwork - US 10
US 10 in both directions: from MN 15 to Sherburne County Road 20
road construction, paving operations, roadway reduced to one lane Width limit 10 ' 0 " — until December 1
Comment: Lane closures and multiple staging. Grading, concrete surfacing, bituminous overlay, light/signal systems. For more information Click Here

last updated July 6
 
Roadwork - US 10
US 10 in both directions: from after Sherburne County Road 52 to before Sherburne County Road 81
road maintenance operations, roadway reduced to one lane — until August 12
Comment: Between Big Lake and Becker from 8 a.m. - 3:30 p.m. Monday through Thursday there are single lane closures/shifts with reduced speeds. Crews will be pothole patching the roadway.

last updated July 27
 
Roadwork - US 59
US 59: from after Yellow Medicine County Road 3 to before MN 67
road construction -- detour in operation, follow the detour signs — until September 30
Comment: Shoulder widening and culvert lining.

last updated July 9
 
Roadwork - US 61
US 61 in both directions: at Goodhue County Road 53
work in the median, center lane closed, roadway reduced to one lane — until August 15
Comment: Motorist will experience slight delays.

last updated July 27
 
Roadwork - US 71
US 71: from after Hubbard County Road 44 to MN 197, US 2
bridge construction, traffic restrictions in force because the route is temporarily closed to trucks with permits -- detour in operation, look out for flaggers, a mandatory speed limit is in force Width limit 11 ' 0 ", No vehicles over 80000 lbs — until June 15, 2011
Comment: On Hwy 197 in Bemidji to 1.7 miles south - Lane width restrictions, intermittent flag person, minor traffic delays. Detour on Hwy 71 starts July 6 through late August 2010. Detour: Hubbard Co.Rd. 9 north to Hubbard Co. Rd. 98 , then east to Beltrami Co. Rd. 2 to Hwy 71. SB traffic will use the same detour in reverse.DETOUR is posted for 9 Ton. Hwy 71 project home page

last updated July 6
 
Roadwork - US 71
US 71: from Beltrami County Road 2 to MN 197, US 2
work on underground services, road open to traffic
Comment: Utility Relocations. May be lane closures and minor delays. On MN 197 from County Rd 50 to Hwy 71S junction Beltrami County Rd 2.

last updated June 24
 
Roadwork - US 169
US 169: from Aitkin County Road 37 to MN 210
road construction, width limit in effect -- detour in operation, pilot car in operation, look out for flaggers — until August 6
Comment: TH 169 from.23 miles N of Garrison to TH 210 in Aitkin and TH 210 from 1000' W of 8th Ave. to Aitkin Co Rd 12, Approx 1 mile E of Jct. TH 169 and TH 210 in Aitkin. Intersection of TH 210 and Aitkin Co 12 will remain Open. Bituminous mill & overlay, turn lane construction, culvet repair & replacement. DETOUR Scheduled for 8/2/10 - 8/5/10. Aitkin Co . Rd 76 from South Jct to N Jct. of TH 169. Widith Limit of 12'. Restriction Dates: Th 169 7/12/10 - 9/30/10 Length of Project 17.6 miles, TH 210: 7/26/1- - 8/6/10 Length of Project 1.7 miles

last updated July 21
 
Roadwork - US 169
US 169: from US 2 to Itasca County Road 10
road construction, width limit in effect, single line traffic - alternating directions Width limit 12 ' 0 " — until August 31
Comment: Traffic signal work at 13th Avenue NE in Grand Rapids. Drainage work near RR bridge east of the Prairie River. Curb and gutter work just north of Pokegama Lake.

last updated July 21
 
Roadwork - US 169
US 169: from MN 65 to MN 65
road construction, width limit in effect, paving operations -- look out for flaggers, observe signs Width limit 12 ' 0 " — until October 30
Comment: On TH 169 between Pengilly and Keewatin, milling and culvert replacement on the four lane section. Daytime lane closures with flaggers.

last updated July 21
 
Alert - Interstate 35
Interstate 35 in both directions: from after Exit 32 Steele County Road 4 to Exit 41 Bridge Street
roadway reduced to one lane, single line traffic - alternating directions, major road construction, closed for vehicles with permits -- consider using an alternate route — until September 14
Comment: Northbound and southbound traffic will be head-to-head on southbound lanes. Expect major delays during peak weekend travel times, including Friday and Sunday evenings. During backups use both lanes, take turns at merge.

last updated July 27
 
Alert - Interstate 35
Interstate 35: at MN 23
road closed, bridge construction, width limit in effect -- detour in operation Width limit 12 ' 0 " — until August 20
Comment: Bridge removal and re-construction at I-35 and the south jct. of MN 23, south of Hinckley. Starting July 27th, all ON and OFF ramps for I-35 at will be closed for a period of ten working days. Traffic will be detoured onto Pine County 61, Pine County 48 and also on I-35.

last updated July 21
 
Alert - Interstate 35
Interstate 35 in both directions: from Exit 209 Pine County Road 46 to Exit 227 Carlton County Road 4
roadway reduced to two lanes, width limit in effect, single line traffic - alternating directions Width limit 12 ' 0 " — until September 15
Comment: On I-35 from Mahtowa to Sturgeon Lake NB I-35 will be routed onto SB I-35 with single lane traffic in each direction.

last updated July 26
 
Alert - Interstate 35
Interstate 35 southbound: from Exit 252 Central Avenue to US 2
entrance ramp closed, major road construction — until October 30
Comment: Central Avenue ramp to SB I-35 is closed, detour to Cody St. to SB I-35.

last updated July 27
 
Alert - Interstate 35
Interstate 35 southbound: from Exit 254 27th Avenue West to I-535, US 53
entrance ramp closed, major road construction — until August 30
Comment: In Duluth, the SB I-35 ramp to Wisconsin I-535 will be closed . Detour to Wisconsin will be NB Hwy 53 to 21st Avenue W to 1st St. , to SB Hwy 53 to I-535.

last updated June 24
 
Alert - Interstate 35
Interstate 35: at I-535, US 53
exit ramp closed, major road construction — until October 30
Comment: On I-35 NB ramp to NB Hwy 53 - is closed, detour to 5th Avenue W & loop back. NB I-35 ramp to SB TH 535 to Superior is closed, detour to Hwy 2 or 27th Avenue W to Michigan St. to 21st Avenue W to I-535.

last updated July 27
 
Alert - Interstate 35
Interstate 35: from Exit 258 21st Avenue East to MN 61
road closed to traffic, major road construction, width limit in effect, length limit in effect -- follow the detour signs — until October 30
Comment: In Duluth traffic will be detoured off NB I-35 at the 21st Avenue east exit ramp. Traffic will follow marked detour route to London Road. SB I-35 traffic will enter the freeway at 21st Avenue East. An addditional detour will be placed on London Road. Southbound traffic will be routed to Superior St. at 40th Avene east

last updated yesterday at 10:12 AM CDT
 
Alert - Interstate 90
Interstate 90: from Exit 175 Oakland Avenue West to Exit 181 28th Street Northeast
roadway reduced to one lane, major road construction, width limit in effect, length limit in effect Vehicle length limit 75.0 ft, Width limit 11 ' 0 " — until October 15
Comment: Daytime lane closures and traffic bypasses. For more information on this project CLICK HERE

last updated April 16
 
Alert - Interstate 90
Interstate 90: at Exit 242 Winona County Road 29
exit ramp closed, entrance ramp closed — until August 31
Comment: Traffic will be detoured to Hwy 74 and Hwy 14 into Lewiston including Enterprise Rest Area

last updated May 15
 
Alert - Interstate 90
Interstate 90: at Exit 249
exit ramp closed, entrance ramp closed — until August 31
Comment: Traffic will be detoured to Winona CR 12 and Hwy 43 North

last updated May 15
 
Alert - Interstate 90
Interstate 90 in both directions: from Exit 272 to Exit 275
roadway reduced to one lane, width limit in effect -- changing traffic patterns Width limit 14 ' 0 " — until November 1
Comment: Eastbound traffic shifted with head to head traffic on Westbound lanes

last updated April 15
 
Alert - Interstate 94
Interstate 94 eastbound: between MN 210 and Exit 61
rest area closed —
Comment: The Iverson Rest Area is closed until further notice because of the effects of flooding.

last updated April 21
 
Alert - US 2
US 2: from Polk County Road 9 to Polk County Road 46
roadway reduced to two lanes, width limit in effect, long term road construction, emergency maintenance -- a mandatory speed limit is in force Width limit 8 ' 6 "
Comment: Eastbound traffic will crossover to westbound lane, creating a two-way two-lane highway for 6,520 feet. This will remain in effect until further notice. US 2 is being reconstructed due to a landslide in 2008.

last updated June 15
 
Alert - US 2
US 2: from Skyline Drive to I-35
entrance ramp closed, road construction — until October 22
Comment: WB TH 2 ramp to SB I-35 is closed, detour to 1st St. to 40th Avenue West to I-35 NB or use Blatnik Bridge.

last updated July 27
 
Alert - US 14
US 14: at I-35
exit ramp closed, entrance ramp closed, closed for vehicles with permits because of construction work -- detour in operation — until November 5
Comment: Detour Rotes: Westbound Hwy 14 to Southbound I-35 ramp traffic will be detoured South on County 45 and West on Hwy 30 Northbound I-35 to Eastbound Hwy 14 traffic will be detoured east on Hwy 30 and North on County 45

last updated April 26
 
Alert - US 52
US 52 in both directions: from I-90 to US 63
roadway reduced to one lane, bridge maintenance operations, width limit in effect, length limit in effect Width limit 9 ' 0 ", Vehicle length limit 75.0 ft — until October 15
Comment: SP 5507-58 TH52 from 0.26 miles east of TH63 to 0.52 miles east of CSAH 1 Bridge rehabilitation on four bridges over CSAH 1 and Willow Creek

last updated July 6
 
Alert - US 53
US 53 southbound: from I-35, I-535 to Exit 255A 21st Avenue West
entrance ramp closed, road construction -- follow local detour, consider using an alternate route — until August 9
Comment: In Duluth, the southbound ramp from TH 53 to the Blatnik Bridge will be closed for 14 days. Traffic will be detoured to Garfield Avenue and back to the Blatnik Bridge.

last updated July 27
 
Alert - US 61
US 61 in both directions: from Winona County Road 15 to before Winona County Road 32
roadway reduced to one lane, road maintenance operations, width limit in effect Width limit 12 ' 0 " — until October 1
Comment: Bituminous Mill and Overlay, Pipe and Culvert Repairs - Intermittent lane closures and flaggers

last updated July 27
 
Alert - US 71
US 71 in both directions: from Cottonwood County Road 25 to before MN 60
road closed, bridge construction, width limit in effect -- detour in operation, follow the signs Width limit 12 ' 0 " — until October 15
Comment: Bridge Replacement Windom TH 71 South: Outhbound detour from TH 71 onto Cottonwood County 17, south to Jackson County 30, east to rejoin TH 71.

last updated July 28
 
Alert - US 75
US 75: from after Norman County Road 51 to before Norman County Road 48
road closed, bridge construction, gross weight limit in effect -- detour in operation, follow the detour signs — until September 30
Comment: This project is one half mile south of Shelly on US 75. Legal weight on detour route. Detour as follows: Northbound 75 traffic at the Jct. of US 75 and Hwy 200 will go east for 14 miles on Hwy 200 to the jct. of Hwy 9, then north on Hwy 9 for 16 miles to the jct. of Polk county 1, go west for 13 miles on county 1 to the jct. of US 75. Southbound traffic will do the reverse.

last updated June 24
 
Alert - US 169
US 169: from Itasca County Road 10 to Itasca County Road 80
road closed, road construction, width limit in effect -- detour in operation Width limit 12 ' 0 " — until August 9
Comment: TH 169 from Taconite to Calumet will be closed starting July 20th. Traffic will be detoured to CSAH 10 south to CSAH 70 east to CSAH 12 north for a total of 7-8 miles.

last updated July 20
 
Alert - US 169
US 169: from MN 73 to St Louis County Road 67
public fair, traffic is much heavier than normal -- drive carefully — until Sunday, at about 4:00 PM CDT

last updated today at 10:41 AM CDT
 
Slow - US 10
US 10 in both directions: from Morrison County Road 13 to Morrison County Road 76
bridge construction, width limit in effect, delays, slow traffic, roadway reduced to two lanes, delays -- consider using an alternate route
Comment: Consider using an alternate route during this weekTraffic is restricted to a single lane is each direction with Flaggers. WB entrance ramp from Morrison CR 76 to WB Hwy 10 is closed. EB exit ramp to Morrison CR 76 is also closed. 12 ft. width restrictions in both directions. Wide loads may check Hwy 27 E or W or Hwy 115 N. at Camp Ripley or Hwy 371 N. to Hwy 210 E or W. DELAYS on Friday July 30, of 15 min each as new beams are being placed.

last updated yesterday at 11:05 AM CDT

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Disclaimer and legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

Zoom In To Minneapolis/St. Paul Area
road closed, bridge construction, width limit in effect on US 71 in both directions from Cottonwood County Road 25 to before MN 60 -- detour in operation, follow the signs — until October 15 last updated July 28 road closed, bridge construction, width limit in effect on Interstate 35 at MN 23 -- detour in operation — until August 20 last updated July 21 road closed to traffic, major road construction, width limit in effect, length limit in effect on Interstate 35 from Exit 258 21st Avenue East to MN 61 -- follow the detour signs — until October 30 last updated yesterday at 10:12 AM CDT road closed, road construction, width limit in effect on US 169 from Itasca County Road 10 to Itasca County Road 80 -- detour in operation — until August 9 last updated July 20 major road construction, width limit in effect, speed restrictions in force, roadway reduced to one lane on Interstate 35 from Exit 249 Boundary Avenue to Exit 258 21st Avenue East -- trucks are recommended to avoid the area, drive with extreme caution — until October 30 last updated June 24 road closed, bridge construction, gross weight limit in effect on US 75 from after Norman County Road 51 to before Norman County Road 48 -- detour in operation, follow the detour signs — until September 30 last updated June 24 exit ramp closed, entrance ramp closed on Interstate 90 at Exit 242 Winona County Road 29 — until August 31 last updated May 15 bridge construction on Interstate 35 at MN 95 — until November 1 last updated June 24 exit ramp closed, entrance ramp closed on Interstate 90 at Exit 249 — until August 31 last updated May 15 roadway reduced to one lane, bridge maintenance operations, width limit in effect, length limit in effect on US 52 in both directions from I-90 to US 63 — until October 15 last updated July 6 roadway reduced to one lane, major road construction, width limit in effect, length limit in effect on Interstate 90 from Exit 175 Oakland Avenue West to Exit 181 28th Street Northeast — until October 15 last updated April 16 bridge construction, traffic restrictions in force on US 71 from after Hubbard County Road 44 to MN 197, US 2 because the route is temporarily closed to trucks with permits -- detour in operation, look out for flaggers, a mandatory speed limit is in force — until June 15, 2011 last updated July 6 bridge maintenance operations, width limit in effect, roadway reduced to one lane on Interstate 94 in both directions from before North Dakota State Line to before US 75 — until August 15 last updated July 12 road construction, paving operations, roadway reduced to one lane on US 10 in both directions from MN 15 to Sherburne County Road 20 — until December 1 last updated July 6 road construction, roadway reduced to one lane, width limit in effect on Interstate 90 westbound from after MN 56 to MN 16 — until September 15 last updated July 9 roadway reduced to one lane, single line traffic - alternating directions, major road construction, closed for vehicles with permits on Interstate 35 in both directions from after Exit 32 Steele County Road 4 to Exit 41 Bridge Street -- consider using an alternate route — until September 14 last updated July 27 bridge construction, roadway reduced to one lane on Interstate 35 at MN 95 last updated June 29 entrance ramp closed, major road construction on Interstate 35 southbound from Exit 252 Central Avenue to US 2 — until October 30 last updated July 27 roadway reduced to one lane, road maintenance operations, width limit in effect on US 61 in both directions from Winona County Road 15 to before Winona County Road 32 — until October 1 last updated July 27 roadway reduced to one lane, width limit in effect on Interstate 90 in both directions from Exit 272 to Exit 275 -- changing traffic patterns — until November 1 last updated April 15 entrance ramp closed, road construction on US 53 southbound from I-35, I-535 to Exit 255A 21st Avenue West -- follow local detour, consider using an alternate route — until August 9 last updated July 27 work on underground services, roadway reduced to one lane, width limit in effect on US 10 from US 75 to Clay County Road 82 — until Monday, at about 5:00 PM CDT last updated yesterday at 9:16 AM CDT road maintenance operations, roadway reduced to one lane on US 10 in both directions from after Sherburne County Road 52 to before Sherburne County Road 81 — until August 12 last updated July 27 entrance ramp closed, road construction on US 2 from Skyline Drive to I-35 — until October 22 last updated July 27 work in the median, center lane closed, roadway reduced to one lane on US 61 in both directions at Goodhue County Road 53 — until August 15 last updated July 27 road construction, bridge construction, delays on Interstate 94 in both directions from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75 — until December 15 last updated May 27 roadway reduced to two lanes, width limit in effect, single line traffic - alternating directions on Interstate 35 in both directions from Exit 209 Pine County Road 46 to Exit 227 Carlton County Road 4 — until September 15 last updated July 26 single line traffic - alternating directions, major road construction, width limit in effect on Interstate 90 in both directions from MN 74 to before Exit 257 — until August 31 last updated June 7 exit ramp closed, entrance ramp closed, closed for vehicles with permits on US 14 at I-35 because of construction work -- detour in operation — until November 5 last updated April 26 road construction, single line traffic - alternating directions, work in the median, width limit in effect on Interstate 94 in both directions from US 71 to MN 238 — until tomorrow at about 10:30 AM CDT last updated May 12 bridge construction, width limit in effect, delays, slow traffic, roadway reduced to two lanes, delays on US 10 in both directions from Morrison County Road 13 to Morrison County Road 76 -- consider using an alternate route last updated yesterday at 11:05 AM CDT road construction, width limit in effect, single line traffic - alternating directions on US 169 from US 2 to Itasca County Road 10 — until August 31 last updated July 21 roadway reduced to two lanes, width limit in effect, long term road construction, emergency maintenance on US 2 from Polk County Road 9 to Polk County Road 46 -- a mandatory speed limit is in force last updated June 15 public fair, traffic is much heavier than normal on US 169 from MN 73 to St Louis County Road 67 -- drive carefully — until Sunday, at about 4:00 PM CDT last updated today at 10:41 AM CDT road construction on US 59 from after Yellow Medicine County Road 3 to before MN 67 -- detour in operation, follow the detour signs — until September 30 last updated July 9 exit ramp closed, major road construction on Interstate 35 at I-535, US 53 — until October 30 last updated July 27 rest area closed on Interstate 94 eastbound between MN 210 and Exit 61 — last updated April 21 entrance ramp closed, major road construction on Interstate 35 southbound from Exit 254 27th Avenue West to I-535, US 53 — until August 30 last updated June 24 work on underground services, road open to traffic on US 71 from Beltrami County Road 2 to MN 197, US 2 last updated June 24 road construction, width limit in effect, paving operations on US 169 from MN 65 to MN 65 -- look out for flaggers, observe signs — until October 30 last updated July 21 road construction, width limit in effect on US 169 from Aitkin County Road 37 to MN 210 -- detour in operation, pilot car in operation, look out for flaggers — until August 6 last updated July 21 Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints