| Roadwork & Maintenance Activities By Month. |
| Roadwork - Interstate 35 |
Interstate 35: from Exit 245 Carlton County Road 61 to Exit 249 Boundary Avenue roadway reduced to one lane, major road construction, width limit in effect, speed restrictions in force Width limit 12 ' 0 ", Speed limit 55 MPH — until October 21 Comment: Marked detour routes will be posted using exit 246 Midway Road. For more information and to sign up for project updates: Click Here last updated May 21 |
| |
| Roadwork - Interstate 90 |
Interstate 90 eastbound: between US 75 and Exit 18 Rock County Road 3 bridge maintenance operations, shoulder closed — until June 11 Comment: Width restriction is removed. East of Luverne; I-90 east bound lane at MP 14. Bridge railing repair. Only the shoulder near bridge railing is closed. last updated May 3 |
| |
| Roadwork - Interstate 90 |
Interstate 90 in both directions: from MN 105 to before Exit 187 Mower County Road 20 roadway reduced to one lane, width limit in effect due to road work Width limit 12 ' 0 " — until June 28 Comment: For more information on this project: Click Here last updated May 1 |
| |
| Roadwork - Interstate 90 |
Interstate 90 in both directions: from after US 61 to Wisconsin State Line roadway reduced to one lane, opposing traffic sharing the roadway, width limit in effect because of major road construction work Width limit 14 ' 0 " — until November 15 Comment: The Dresbach Bridge and Interchange Project at the state line Mississippi River crossing will have single lane opposing direction traffic until November 15th. For more information on this project: Click Here last updated May 14 |
| |
| Roadwork - Interstate 94 |
Interstate 94 in both directions: from Exit 171 Stearns County Road 7 to MN 24 roadway reduced to one lane, paving operations, long delays Width limit 11 ' 0 " — until July 26 Comment: Paving operations between Stearns CR 75 in St. Cloud & Hwy. 24 - in Clearwater. For detailed info and to sign up for project email updates: Click Here. For temporary travel times: Click Here. last updated May 1 |
| |
| Roadwork - Interstate 94 |
Interstate 94: at Wisconsin State Line major road construction — until November 15 Comment: For WisDOT West Central Freeway Construction Updates: Click Here last updated May 21 |
| |
| Roadwork - Interstate 535 |
Interstate 535: from Wisconsin State Line to I-35, US 53 roadway reduced to one lane, bridge construction, width limit in effect -- observe speed limits Width limit 12 ' 0 " — until October 21 Comment: On Blatnik bridge NB will have temporary right lane closures from 9:00 am to 6:00 pm. Monday through Saturday. SB right lane will be permanent closure until 6/14/2013. SB traffic for OSOW vehicles is restricted to 12' wide. For more information Click Here last updated May 20 |
| |
| Roadwork - Interstate 535 |
Interstate 535: from Wisconsin State Line to I-35, US 53 bridge construction, width limit in effect -- observe the recommended speed Width limit 12 ' 0 " — until October 18 Comment: Daytime lane closures and restrictions only, Monday thru Saturday. last updated April 10 |
| |
| Roadwork - US 8 |
US 8: from after Chisago County Road 77 to before Chisago County Road 32 construction work — until June 3 Comment: For more information on this project:Click Here last updated January 28 |
| |
| Roadwork - US 10 |
US 10: from North Dakota State Line to US 75 road construction because of construction work Width limit 11 ' 0 " — until September 30 Comment: Intermittent lane closures due to signal replacements, pedestrian accessibility improvements and resurfacing. last updated May 20 |
| |
| Roadwork - US 10 |
US 10: from US 75 to before Clay County Road 82 road construction because of construction work Width limit 11 ' 0 " — until September 30 Comment: Intermittent lane closures due to signal replacements and pedestrian accessibility improvements. last updated May 20 |
| |
| Roadwork - US 10 |
US 10 in both directions: from after Clay County Road 113 to 6th Street roadway reduced to one lane due to road construction work Width limit 12 ' 0 " — until September 30 Comment: Lane closures for an intersection modification and traffic signal installation project at Co Rd 31/33. last updated May 13 |
| |
| Roadwork - US 10 |
US 10 in both directions: from after Becker County Road 5 to before Morrow Avenue roadway reduced to one lane due to road construction work Width limit 12 ' 0 " — until August 2 Comment: Two-lane, two-way traffic due to a resurfacing project. last updated May 20 |
| |
| Roadwork - US 10 |
US 10 in both directions: from Becker County Road 22 to before Becker County Road 10 roadway reduced to one lane due to road construction work Width limit 12 ' 0 " — starting 12:00 AM, 05/28/13 until June 28 Comment: Two-way traffic. DNR box culvert installation. last updated yesterday at 8:54 AM CDT |
| |
| Roadwork - US 14 |
US 14 in both directions: from after Nicollet County Road 17 to before US 169 road construction, bridge construction, short delays -- look out for flaggers Width limit 12 ' 0 " — until September 20 Comment: Grading, Concrete/bituminous surfacing, lighting, roundabouts & Bridge 52003. Temporary concrete barrier. Please drive careful and watch out for workers in the work zone. last updated May 21 |
| |
| Roadwork - US 52 |
US 52 southbound: from after Goodhue County Road 11 to before MN 60 roadway reduced to one lane because there is work on the shoulder from 05:00am CDT to 09:00pm CDT on weekdays and Saturdays — until October 31 Comment: Northern States Power is installing an electrical sub-station and will need to use the lane for oversize loads moving in and out of the work zone. last updated May 14 |
| |
| Roadwork - US 53 |
US 53: from MN 33 to St Louis County Road 47 bridge inspection work is in progress, width limit in effect Width limit 14 ' 0 " — until today at about 4:30 PM CDT Comment: Daytime restrictions only. last updated April 10 |
| |
| Roadwork - US 53 |
US 53: from St Louis County Road 652 to St Louis County Road 948 major road construction, width limit in effect -- reduce your speed, trucks are entering the roadway, look out for flaggers Width limit 14 ' 0 " — until October 1 Comment: On MN53 from Virginia to Cook trucks hauling. Reduced speed in work zone. Traffic may be stopped for rock blasting. For more info Click Here last updated May 20 |
| |
| Roadwork - US 59 |
US 59: from after MN 55, MN 79 to before I-94 road closed, detour in operation due to road construction work -- follow the detour signs — until July 5 Comment: Resurfacing project. NO OVERWEIGHT VEHICLES ON DETOUR Detour: from I-94 take Exit 55, the Wendell Road. The detour will follow Otter Tail County Road 1/Grant County Road 11, Grant County Road 1/25 and Highway 54 to Elbow Lake. last updated yesterday at 3:06 PM CDT |
| |
| Roadwork - US 65 |
US 65 in both directions: from Freeborn County Road 106 to before I-35 roadway reduced to one lane, width limit in effect because the road is being repaved -- look out for flaggers, pilot car in operation Width limit 11 ' 0 " — until July 1 last updated May 8 |
| |
| Roadwork - US 71 |
US 71: from after MN 27 to before Todd County Road 24 construction work — until July 19 last updated May 10 |
| |
| Roadwork - US 75 |
US 75: from after MN 68 to before MN 67 road construction, traffic is being held. Expect delays -- pilot car in operation, look out for flaggers Width limit 10 ' 0 " — until July 8 Comment: Bituminous Mill & Overlay last updated May 1 |
| |
| Roadwork - US 75 |
US 75: from MN 9 to Wilkin County Road 20 road construction -- look out for flaggers, pilot car in operation Width limit 12 ' 0 " — until June 28 Comment: Resurfacing project. Expect lane closures with flaggers and pilot cars. last updated May 20 |
| |
| Roadwork - US 75 |
US 75: from after Exit 1A to US 10 road construction because of construction work Width limit 11 ' 0 " — until September 30 Comment: Comment: Intermittent lane closures due to signal replacements and pedestrian accessibility improvements. last updated May 20 |
| |
| Roadwork - US 169 |
US 169: from Mille Lacs County Road 11 to before MN 27 long term road construction — until July 2 Comment: There are no detours. For detailed project information: Click Here last updated April 24 |
| |
| Roadwork - US 169 |
US 169: from after US 2 to before Itasca County Road 21 roadway reduced to one lane, construction work, width limit in effect Width limit 12 ' 0 " — until September 2 Comment: On MN 169 in Grand Rapids turn lanes to Glenwood Drive will be closed and traffic will be reduced to one lane in both directions. last updated May 20 |
| |
| Roadwork - MN 1 |
MN 1: from after MN 89 to before Township Road 404 bridge demolition work, detour in operation — until August 24 Comment: Road closed and detour to begin June 3-Aug 24, Hwy 1 E to Beltrami Co Rd #23 to Beltrami County #32 E to TH 72 North to Hwy 1 at busy corner. No OSOW travel on detour. last updated yesterday at 10:39 AM CDT |
| |
| Roadwork - MN 1 |
MN 1: from after Saint Louis County Road 120 to before Lake County Road 2 road construction, width limit in effect, short delays -- look out for flaggers Width limit 12 ' 0 " — until June 24 Comment: On MN 1 south of Ely, traffic may have short delays due to flagging operations. Loads wider than 12 ' may be allowed with District approval. last updated May 20 |
| |
| Roadwork - MN 3 |
MN 3 in both directions: from MN 21 to MN 246 roadway reduced to one lane, width limit in effect because the road is being repaved -- look out for flaggers, pilot car in operation Width limit 11 ' 0 " — until June 20 Comment: Grading, Bituminous Mill & Overlay, Signal Systems andd ADA Improvements last updated May 8 |
| |
| Roadwork - MN 4 |
MN 4: from after Meeker County Road 7 to before MN 7 road closed, road construction -- follow the detour signs — until October 29 Comment: Grading, resurfacing and water main work. last updated May 15 |
| |
| Roadwork - MN 5 |
MN 5 in both directions: from after MN 22 to before Sibley County Road 34 road construction, bridge construction, detour in operation, short delays -- look out for flaggers Width limit 12 ' 0 " — until July 2 Comment: Mill and Overlay, Approach panels, ADA Imp. and Bridge 9246. Detour for part of the construction is TH 19 to CSAH 13. Drive careful and watch out for workers in the work zone last updated May 21 |
| |
| Roadwork - MN 7 |
MN 7: from after MN 119 to before MN 29 road construction, traffic is being held. Expect delays -- pilot car in operation, look out for flaggers — until July 8 Comment: Bituminous Overlay with Shoulder Reclamation & High Tension Cable Guardrail last updated May 1 |
| |
| Roadwork - MN 15 |
MN 15 in both directions: from after Stearns County Road 150 to before I-94 paving operations, single line traffic - alternating directions -- look out for flaggers Width limit 12 ' 0 " — until July 1 Comment: Two to four mile lane closures. No loads over 12' wide in work zone. For more information Click Here last updated May 16 |
| |
| Roadwork - MN 15 |
MN 15 northbound: from MN 23 to Stearns County Road 1 paving operations, roadway reduced to one lane -- left turning lanes — until June 17 Comment: Stearns County is doing a milling project on Veterans Drive at the Jct. with TH 15 - the dual northbound left turn lanes at this intersection will be reduced to a single left turn lane. The reduced lane is expected to be in place until the project completion of June 15, 2013. For more information: Click Here last updated May 3 |
| |
| Roadwork - MN 15 |
MN 15 in both directions: from MN 23 to Bridge of Hope utility work Width limit 12 ' 0 " — until August 1 Comment: ADA improvements and signal system revisions. TH 15 - from 2nd St. S. to 12th St. N. - thru July, 2013. Periodically to one lane in both directions at all effected intersections . 12 ft. wide permit restriction. For more information: Click Here last updated May 20 |
| |
| Roadwork - MN 15 |
MN 15 in both directions: from after MN 23 to US 10 road reconstruction Width limit 12 ' 0 " — until November 6 Comment: Highway 15/Stearns CR 120 Diverging Diamond interchange project underway. Hwy. 15/CR 120 is currently closed; follow signed detours or alternate routes. Expect delays and congestion during peak traffic hours and as lanes close intermittently. 12 ft. wide permit restriction. Sign up for email updates; or get detailed information including schedule a maps. Click Here For more information: Click Here last updated April 17 |
| |
| Roadwork - MN 16 |
MN 16 in both directions: from MN 250 to before MN 43 road closed ahead because the road is being repaved — until September 8 Comment: No OS/OW restrictions on detour - Detour is Fillmore County Road 25 and Highway 30. For more information about this project:Click Here last updated May 20 |
| |
| Roadwork - MN 19 |
MN 19: from after MN 271 to Lyon County Road 5B road construction, traffic is being held. Expect delays -- pilot car in operation, look out for flaggers — until August 23 Comment: Bituminious Overlay and ADA Sidewalk Work last updated April 26 |
| |
| Roadwork - MN 23 |
MN 23: from I-90 to MN 269 road closed, detour in operation, paving operations — until August 1 Comment: No restrictions for oversize/overweight loads on the detour. Concrete paving on Hwy 23 from I-90 to Jasper, MN. Detour is I-90 to Hwy 75 to Pipestone MN; adds 15 miles. last updated May 6 |
| |
| Roadwork - MN 23 |
MN 23: from after Rock County Road 14 to before MN 30 road construction, traffic is being held. Expect delays -- pilot car in operation, look out for flaggers — until July 3 Comment: 3 Bituminous Mill & Overlay, ADA sidewalk work in Jasper last updated April 29 |
| |
| Roadwork - MN 23 |
MN 23 in both directions: between MN 25 and Benton County Road 27 emergency maintenance, emergency repairs, roadway reduced to one lane — until tomorrow at about 12:00 PM CDT Comment: West of Foley - MN 23 - between 95th Ave. & 85th Ave. is reduced to a single lane - 7 AM - 7 PM, May 22. The closure is needed as crews repair a washout beneath the roadway. For more information: Click Here last updated yesterday at 2:51 PM CDT |
| |
| Roadwork - MN 23 |
MN 23: from MN 39 to Raleigh Street roadway reduced to one lane, width limit in effect, single line traffic - alternating directions Width limit 11 ' 0 " — until June 17 Comment: On MN 23 near Fond Du Lac, both directions of traffic will be carried head to head in the NB lanes for one week then switch to the SB lanes. last updated May 20 |
| |
| Roadwork - MN 24 |
MN 24 in both directions: from Wright County Road 50 to before Sherburne County Road 8 paving operations, single line traffic - alternating directions -- look out for flaggers Width limit 12 ' 0 " — until July 1 Comment: Two to four mile lane closures. No loads over 12' wide in work zone. For more information Click Here last updated May 16 |
| |
| Roadwork - MN 28 |
MN 28 in both directions: from Stearns County Road 26 to US 71 single line traffic - alternating directions, paving operations Width limit 12 ' 0 " — until June 19 Comment: For more detailed information on this project: Click Here last updated April 24 |
| |
| Roadwork - MN 29 |
MN 29: from after Pope County Road 18 to before MN 114, MN 28 road construction, shoulder closed — until May 31 Comment: Bridge work completion: Crews will finish the multi-use trail, lighting and concrete curb and gutter, finish the final layer of asphalt and paint the new bridge. No OSOW restrictions last updated May 2 |
| |
| Roadwork - MN 33 |
MN 33: from Carlton County Road 7 to before Saint Louis County Road 873 bridge inspection work is in progress, width limit in effect Width limit 12 ' 0 " — until today at about 5:00 PM CDT Comment: Daytime lane restrictions only. last updated April 10 |
| |
| Roadwork - MN 56 |
MN 56: from after US 14 to before Dodge County Road 24 road closed for repairs, closed for vehicles with permits because of road maintenance activities — starting 12:00 AM, 05/24/13 until May 28 Comment: Detour on Dodge County Roads 24, 7, and 34 last updated May 20 |
| |
| Roadwork - MN 58 |
MN 58 in both directions: from US 52 to before US 63 roadway reduced to one lane because the road is being repaved -- look out for flaggers, pilot car in operation — until August 1 Comment: Mill & Overlay from Highway 52 to 0.8 Mi. S of County Road 5 & ADA Improvements last updated May 8 |
| |
| Roadwork - MN 60 |
MN 60: from US 59 to I-90 road construction, width limit in effect Width limit 10 ' 0 " — until November 15 Comment: For detours and project information: Click Here 10 ft width restriction on detour route for both Hwy 59 and 60. last updated May 14 |
| |
| Roadwork - MN 68 |
MN 68: from after US 75 to before Yellow Medicine County Road 12 road construction, traffic is being held. Expect delays -- pilot car in operation, look out for flaggers — until May 31 Comment: Bituminous Overlay last updated April 29 |
| |
| Roadwork - MN 68 |
MN 68: from after Lyon County Road 33 - County Road 76 to before Lyon County Road 67D road construction -- detour in operation, follow the detour signs — until July 29 Comment: Replace Sewer Lines, Partial Street Reconstruction, ADA Sidewalk Improvements, Mill and Overlay. last updated April 29 |
| |
| Roadwork - MN 95 |
MN 95 in both directions: from MN 23 to MN 47 paving operations, single line traffic - alternating directions -- look out for flaggers Width limit 12 ' 0 " — until July 1 Comment: Two to four mile lane closures. No loads over 12' wide in work zone. For more information Click Here last updated May 16 |
| |
| Roadwork - MN 95 |
MN 95 in both directions: at Mille Lacs County Road 29 road maintenance operations — starting 7:00 AM, 05/28/13 until July 1 Comment: Landscaping in the roundabout. Short intermittent lane closures. No OS/OW restrictions. For more information Click Here last updated May 16 |
| |
| Roadwork - MN 95 |
MN 95 in both directions: from Chisago County Road 9 to Chisago County Road 20 road closed, major road construction — until June 13 Comment: MN 95 will be opened to LOCAL ACCESS ONLY. For detailed info and to sign up for project email updates: Click Here. last updated May 15 |
| |
| Roadwork - MN 200 |
MN 200: from after MN 64 to before Hubbard County Road 39 road closed to traffic, road maintenance operations, detour in operation — until August 19 Comment: Grading, bituminous surfacing. Road closure and detour to begin 5/28 - 8/19. Two Way Detour: cty #39 NE to cty #45 N to cty 16 W cty 36 S. No restrictions until detour in effect. last updated yesterday at 10:55 AM CDT |
| |
| Roadwork - MN 210 |
MN 210: from MN 45 to before Carlton County Road 1 roadway reduced to one lane, width limit in effect, temporary traffic lights -- observe the recommended speed Width limit 16 ' 0 " — until October 1 Comment: On MN 210 repair work will resume on roadway and bridge over the St. Louis River. A temporary signal system will be used to direct traffic to one lane. For more information Click Here last updated May 20 |
| |
| Roadwork - MN 210 |
MN 210: from after Carlton County Road 1 to MN 23 road closed to traffic, road reconstruction -- consider using an alternate route — until January 1, 2014 Comment: TH 210 closed from Jay Cooke Park Road to Fond Du Lac until 2014. Bridge and roadway reconstruction in this heavily-damaged area. West entrance to Jay Cooke State Park is open. last updated April 16 |
| |
| Roadwork - MN 238 |
MN 238 in both directions: at Stearns County Road 53 road reconstruction, detour in operation Width limit 10 ' 0 " — until November 6 Comment: TH 238/Railroad Dr. in Albany - closed between 1st St. & 5th St. - April 17 thru July and closed between 5th St. & 8th St. from August to mid-Oct., 2013. For more information/detour map: visit: Click Here 10 ft. wide permit restriction. last updated April 17 |
| |
| Roadwork - MN 371 |
MN 371: from South Junction with County Road 107 to before South Junction with County Road 11 construction work — until November 1 last updated May 10 |