| Roadwork & Maintenance Activities By Month. |
| Roadwork - Interstate 35 |
Interstate 35 in both directions: from after Exit 32 Steele County Road 4 to Exit 41 Bridge Street roadway reduced to one lane, single line traffic - alternating directions, major road construction, closed for vehicles with permits -- consider using an alternate route — until September 14 Comment: Northbound and southbound traffic will be head-to-head on southbound lanes. Expect major delays during peak weekend travel times, including Friday and Sunday evenings. During backups use both lanes, take turns at merge. last updated July 27 |
| |
| Roadwork - Interstate 35 |
Interstate 35 in both directions: between MN 19 and Exit 76 Deuce Road bridge closed, bridge maintenance operations — for the next month Comment: The bridge over I-35 is closed. Detour: From eastbound Rice CR 86, go north on Scott CR 91, east on Scott CR 2, south on Scott CR 46 and back to Rice CR 86. Work is expected to be completed by the end of September, weather permitting. last updated August 30 |
| |
| Roadwork - Interstate 35 |
Interstate 35 in both directions: between MN 97 and Exit 131 Broadway bridge construction — for the next four months Comment: For more information on this Washington County-led project CLICK HERE last updated July 2 |
| |
| Roadwork - Interstate 90 |
Interstate 90 in both directions: from after MN 4 to before Exit 128 road maintenance operations -- trucks are entering the roadway — until October 5 Comment: Crews working in ditch or shoulder area to repair culverts on I-90 from near Sherburn to Jct of Hwy 254 . Watch for equipment moving. last updated August 6 |
| |
| Roadwork - Interstate 90 |
Interstate 90: from Exit 175 Oakland Avenue West to Exit 181 28th Street Northeast roadway reduced to one lane, major road construction, width limit in effect, length limit in effect Vehicle length limit 75.0 ft, Width limit 11 ' 0 " — until October 15 Comment: Daytime lane closures and traffic bypasses. For more information on this project CLICK HERE last updated April 16 |
| |
| Roadwork - Interstate 90 |
Interstate 90 westbound: from after MN 56 to MN 16 road construction, roadway reduced to one lane, width limit in effect Width limit 10 ' 0 " — until September 15 Comment: Concrete Pavement Rehabilitation, Grinding and Biruminous Should Replacement last updated July 9 |
| |
| Roadwork - Interstate 94 |
Interstate 94 in both directions: from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75 road construction, bridge construction, delays — until December 15 Comment: I94 - MP 193- MP 195 - Bridge construction, grading, and paving. Intermittent lane closures and lane shifts. All directions are open to traffic. Could be some delay. For more information Click Here last updated May 27 |
| |
| Roadwork - US 8 |
US 8 in both directions: from after Broadway Street to before Chisago County Road 82 road closed intermittently, roadway reduced to one lane, road construction — starting 9:00 AM, 09/09/10 until today at about 4:00 PM CDT Comment: Paving on Hwy 8 and Grand Ave. Flagging operation last updated yesterday at 5:23 PM CDT |
| |
| Roadwork - US 10 |
US 10 in both directions: from MN 15 to Sherburne County Road 20 road construction, paving operations, roadway reduced to one lane Width limit 10 ' 0 " — until December 1 Comment: Lane closures and multiple staging. Grading, concrete surfacing, bituminous overlay, light/signal systems. For more information Click Here last updated July 6 |
| |
| Roadwork - US 10 |
US 10 in both directions: from Sherburne County Road 43 to 185th Avenue road construction, paving operations, roadway reduced to two lanes, closed for vehicles with permits, width limit in effect, height limit in effect, gross weight limit in effect Width limit 8 ' 6 ", Height limit 13 ' 6 ", No vehicles over 80000 lbs from 07:00am CDT to 07:00pm CDT on weekdays — until December 1 Comment: Highway 10 - from Big Lake to Elk River - Mill and Overlay - starting in mid August til approximately mid November. No permits on the construction project. Please visit for more information last updated August 12 |
| |
| Roadwork - US 10 |
US 10 eastbound: from 185th Avenue to Adams Street roadway reduced to one lane because the road is being repaved — starting 9:00 AM, 09/09/10 until today at about 9:00 PM CDT last updated yesterday at 4:14 PM CDT |
| |
| Roadwork - US 14 |
US 14 in both directions: from after US 914A to before US 914A road closed, major road construction, width limit in effect -- detour in operation Width limit 12 ' 0 " — until October 16 Comment: TH 14 is detoured from Waseca County Road 17 and Waseca County Road 14 . between Janesville and Waseca Follow the detour signs and be aware while driving in the work zone. last updated August 4 |
| |
| Roadwork - US 14 |
US 14 westbound: from I-35 to Steele County Road 45 major road construction, exit ramp closed, closed for vehicles with permits -- detour in operation — starting 3:00 PM, 09/24/10 until September 26 Comment: The ramp from westbound Highway 14 to northbound Interstate 35 will close each weekend through September beginning Friday, August 13. Detour: Steele County Road 180 west, to Steele County Road 43, north to Steele County 8 west, continue on Steele County Road 34 west, and back to I-35 north. Motorist needing to continue on Highway 14 west should stay on Steele County Road 34 west/26th Street northwest, to 24th Ave. Northwest, and back to Highway 14 toward Mankato. The ramp closure is necessary to reduce traffic back-ups on I-35 northbound during peak weekend travel times. The extended closure is needed to replace a culvert on the ramp. last updated August 10 |
| |
| Roadwork - US 14 |
US 14 westbound: from I-35 to Steele County Road 45 major road construction, exit ramp closed, closed for vehicles with permits -- detour in operation — starting 3:00 PM, 09/17/10 until September 19 Comment: The ramp from westbound Highway 14 to northbound Interstate 35 will close each weekend through September beginning Friady, August 13. Detour: Steele County Road 180 west, to Steele County Road 43, north to Steele County 8 west, continue on Steele County Road 34 west, and back to I-35 north. Motorist needing to continue on Highway 14 west should stay on Steele County Road 34 west/26th Street Northwest, to 24th Ave. northwest, and back to Highway 14 west toward Mankato. The ramp closure is necessary to reduce traffic back-ups on I-35 northbound during peak weekend travel times. The extended closure is needed to replace a culvert on the ramp. last updated August 10 |
| |
| Roadwork - US 14 |
US 14: from I-35 to Steele County Road 45 major road construction, exit ramp closed, closed for vehicles with permits — starting 3:00 PM, 09/10/10 until Sunday, at about 9:00 PM CDT Comment: The ramp from westbound Highwya 14 to norothbound Interstate 35 will close each weekend through September beginning Friday, August 13. Detour:Seele County Road 180 west, to Steele County Road 43, north to Steele County 8 west, continue on Steele County Road 34 west, and back to I-35 north. Mortorist needing to continue on Highway 14 west should stay on Steele County Road 34west/26th Street Northwest, to 24th ave. Northwest, and back to Highway 14 west toward Mankato. last updated August 10 |
| |
| Roadwork - US 14 |
US 14: at I-35 exit ramp closed, entrance ramp closed, closed for vehicles with permits because of construction work -- detour in operation — until November 5 Comment: Detour Rotes: Westbound Hwy 14 to Southbound I-35 ramp traffic will be detoured South on County 45 and West on Hwy 30 Northbound I-35 to Eastbound Hwy 14 traffic will be detoured east on Hwy 30 and North on County 45 last updated April 26 |
| |
| Roadwork - US 61 |
US 61 in both directions: at Washington County Road 2 intersecting road closed, road construction -- follow local detour — until October 29 Comment: For more information:Click Here last updated July 19 |
| |
| Roadwork - US 169 |
US 169 southbound: from Sherburne County Road 33 to Sherburne County Road 4 road construction, left lane closed, roadway reduced to one lane from 07:00am CDT to 08:30pm CDT on weekdays — starting 7:00 AM, 09/16/10 until October 29 Comment: TH 169 - in Sherburne Co. on TH 169 from 197th Avenue - Elk River to CR 74 - MP - 160 - MP 165 - Median Cable Guardrail Installation - starting Sept. 16th for approximately 1 month. SB left driving lane closed from 7:00 a.m - til dark. No permit restrictions. For more information ,a href="http://www.dot.state.mn.us/d3/construct.html" target=" _blank". last updated yesterday at 11:50 AM CDT |
| |
| Roadwork - MN 13 |
MN 13 southbound: from I-90 to MN 30 road construction, width limit in effect because the roadway is reduced to one lane -- pilot car in operation, look out for flaggers Width limit 10 ' 0 " — until October 31 Comment: Bituminous Mill & Overlay last updated August 3 |
| |
| Roadwork - MN 15 |
MN 15 in both directions: from Iowa State Line to before Martin County Road 26 road construction, roadway reduced to one lane, width limit in effect -- pilot car in operation, look out for flaggers Width limit 12 ' 0 " — starting 7:00 AM, 09/13/10 until September 28 Comment: TH 15 Mill & Overlay south of Fairmont, weather permitting last updated September 7 |
| |
| Roadwork - MN 19 |
MN 19 eastbound: from MN 13 to MN 3 major road construction, width limit in effect, single line traffic - alternating directions -- pilot car in operation Width limit 10 ' 0 " — until September 15 last updated July 9 |
| |
| Roadwork - MN 22 |
MN 22 in both directions: from after US 14 to before Le Sueur County Road 101 road closed, closed for vehicles with permits, road maintenance operations -- detour in operation — starting 7:00 AM, 09/14/10 until September 14 Comment: TH Detour between Mankato and Saint Peter for 1 day to replace a failing culvert. Traffic will be detoured to Blue Earth County 2 & LeSueur County Roads 19 and 101. The culvert is located just south of LeSueur County Road 101. last updated September 7 |
| |
| Roadwork - MN 23 |
MN 23: from after South Junction with County Road 66 to before Stearns County Road 12 - County Road 43 road construction — until September 17, 2012 Comment: Construct a four-lane divided highway bypass of Paynesville to include bridges and lighting. last updated August 26 |
| |
| Roadwork - MN 25 |
MN 25 in both directions: from I-94 to Sherburne County Road 11 - County Road 14 road construction, paving operations, roadway reduced to one lane, width limit in effect Width limit 8 ' 6 " from 07:00pm CDT to 06:00am CDT on weekdays — until November 16 Comment: TH 25 - from I94 Br. to Mississippi River Br. in the City of Monticello - bituminous mill & overlay, ADA improvements, & signal revisions. Nighttime work - No over width permits - 7:00 p.m. - 6:00 a.m. Please visit last updated September 3 |
| |
| Roadwork - MN 60 |
MN 60 westbound: from MN 13 to MN 21 road construction, roadway reduced to one lane, width limit in effect -- pilot car in operation, look out for flaggers Width limit 10 ' 0 " — until October 15 Comment: Grading, Bituminous Mill & Overlay and Culvert Repairs last updated August 3 |
| |
| Roadwork - MN 66 |
MN 66 in both directions: after Blue Earth County Road 9 road closed, width limit in effect, road maintenance operations -- detour in operation, follow the signs Width limit 12 ' 0 " — starting 7:00 AM, 09/13/10 until September 27 Comment: Hwy 66 south of Mankato: Access available to Red Jacket Trail Park from County Road 90. Detours are Blue Earth County Roads 90, 33 and 9. Follow signs. last updated yesterday at 2:07 PM CDT |
| |
| Roadwork - MN 241 |
MN 241 westbound: from Wright County Road 19 to I-94 emergency maintenance, right lane closed Comment: Lane closure because of railroad tracks. cs last updated September 7 |