| Commercial Vehicle Permits And Restrictions. |
| Permit Status - Interstate 35 |
Interstate 35: from Exit 245 Carlton County Road 61 to Exit 249 Boundary Avenue roadway reduced to one lane, major road construction, width limit in effect, speed restrictions in force Width limit 12 ' 0 ", Speed limit 55 MPH — until October 21 Comment: Marked detour routes will be posted using exit 246 Midway Road. For more information and to sign up for project updates: Click Here last updated yesterday at 3:09 PM CDT |
| |
| Permit Status - US 53 |
US 53: from MN 33 to St Louis County Road 47 bridge inspection work is in progress, width limit in effect Width limit 14 ' 0 " — until tomorrow at about 4:30 PM CDT Comment: Daytime restrictions only. last updated April 10 |
| |
| Permit Status - US 169 |
US 169: from after US 2 to before Itasca County Road 21 roadway reduced to one lane, construction work, width limit in effect Width limit 12 ' 0 " — until September 2 Comment: On MN 169 in Grand Rapids turn lanes to Glenwood Drive will be closed and traffic will be reduced to one lane in both directions. last updated May 20 |
| |
| Permit Status - MN 33 |
MN 33: from Carlton County Road 7 to before Saint Louis County Road 873 bridge inspection work is in progress, width limit in effect Width limit 12 ' 0 " — until tomorrow at about 5:00 PM CDT Comment: Daytime lane restrictions only. last updated April 10 |
| |
| Permit Status - MN 210 |
MN 210: from MN 45 to before Carlton County Road 1 roadway reduced to one lane, width limit in effect, temporary traffic lights -- observe the recommended speed Width limit 16 ' 0 " — until October 1 Comment: On MN 210 repair work will resume on roadway and bridge over the St. Louis River. A temporary signal system will be used to direct traffic to one lane. For more information Click Here last updated May 20 |